STUDI INTERKONEKSI SUMUR INJEKSI TERHADAP SUMUR PRODUKSI DENGAN METODE ISOTOP ALAM (2 H DAN 18 O) DI LAPANGAN MINYAK TALANG JIMAR, PT. PERTAMINA EPREGION SUMATERA, FIELD PRABUMULIH
The research to study the interconnection of injection wells toward production wells has been conducted in Talang Jimar Oil Field, PT. Pertamina Sumatera Region, Prabumulih Field with natural isotopes (2H and 18O) method. The first purpose of this research is to know the interconnection of injection...
Main Authors: | , RIZKY PADUTAMA, , Ir. Agus Budhie Wijatna, M.Si. |
---|---|
Format: | Thesis |
Udgivet: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Fag: |
Lignende værker
-
Optimasi Laju Injeksi Pada Sumur Kandidat Convert to Injection (CTI) di Area X Lapangan Y
af: Tomi Erfando, et al.
Udgivet: (2017-12-01) -
Perencanaan proyek pemboran sumur Tambun 06 di lapangan minyak Pertamina daerah operasi hulu Jawa bagian barat
af: , WINDYAWAN, Pramoko Ari, et al.
Udgivet: (2002) -
Sonolog Test Sumur Minyak menggunakan Alat Total Well Management Echometer sebagai Well Analyzer Sumur di Pertamina EP Subang
af: NANDANG TARYANA
Udgivet: (2014-07-01) -
STUDI INTERKONEKSI ANTARA SUMUR REINJEKSI DENGAN
SUMUR PRODUKSI DAN ANALISIS MASS RECOVERY
DENGAN METODE ISOTOP STABIL
18
O DAN DI LAPANGAN
PANAS BUMI KAMOJANG, JAWA BARAT
af: D. Febriani, D. Febriani, et al.
Udgivet: (2014) -
Optimasi Perhitungan Laju Alir minyak Dengan Meningkatkan Kinerja Pompa Hydraulic Pada Sumur Minyak Di Lapangan PT. KSO Pertamina Sarolangon Jambi
af: Ali Musnal
Udgivet: (2015-10-01)