Summary: | Time constraints in project activities, requiring the contractor to work on the
project schedule carefully, especially for work schedule of formwork. Because if it's
too late, other jobs will be choked up,as like going to work iron and foundry work.
Through a variety of methods that have been used, finally taken formwork Semi
System methods. formwork Semi system work methods considered very efficient in
terms of time and work productivity outcomes.
Based on implement it, formwork with formwork semi system method fairly
,
easy for installation and disassembly way, because in aids with a tower crane. Most
of the material made from steel, from strengthenings, accessories of the stretcher on
the model of formwork semi system.
With using formwork semi system in addition to minimizing the material
waste also saves the use of materials. Due to the use of the material it self can be
used repeatedly. the type of formwork is suitable for project work are typical highrise
building.
|