TINJAUAN JAM OPERASIONAL TOWER CRANE (STUDI KASUS PADA PEKERJAAN STRUKTUR PROYEK MALL BINTARO XCHANGE)
The function of Tower Crane is as a transfer material from one place to other places, both vertically or horizontally. Tower Crane commonly used because two advantages of Tower Crane�s height. Tower Crane can be adjusted with the height of building. Besides that, Tower Crane has broad range. The a...
Main Authors: | , MEUTIA WIDYA HERNINGRUM, , Dian Sestining Ayu, ST., MT |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Similar Items
-
Studi Kelayakan Finansial Pada Proyek Apartemen Bintaro Plaza – Breeze Tower
by: Putri Agustina Hidayat, et al.
Published: (2021-06-01) -
METODE PELAKSANAAN DAN SPESIFIKASI BALOK PRATEGANG (POST TENSION) PADA PROYEK BINTARO X-CHANGE, BINTARO, JAKARTA SELATAN
by: , MUHAMMAD ROYYAN ANDRIANTO, et al.
Published: (2014) -
Analisis Keterlambatan Pengiriman Material Beton (Studi Kasus Proyek Breeze Tower, Bintaro PT. Tatamulia Nusantara Indah)
by: Andre Feliks Setiawan, et al.
Published: (2019-08-01) -
Optimasi Penempatan Group Tower Crane pada Proyek Pembangunan My Tower Surabaya
by: Ahmad Puguh Septiawan, et al.
Published: (2017-03-01) -
SCHEDULING TENAGA KERJA PEKERJAAN PIER R2 SAMPAI ABUTMENT A3 PROYEK FLY OVER (FO) JOMBOR
by: , HENING AGUSTYA, et al.
Published: (2013)