Summary: | Traffic jam usual things that happen on intersection Jombor because of volume
the vehicle who dense either into direction of Yogyakarta nor into outside of town.
Jombor flyovers project is an effort made to overcome the congestion that occurs at
the intersection of Jombor.
Work implementation and analysis of heavy equipment production capacity in
pier R2 is the porpuse of this task report. The menthod used is observation,
interviews, literature, documentation and analysis. Where, the five indispensable in
the proscess of observation of work and analysis of heavy equipment production
capacity.
Based on the observations and analyzes can be concluded that in the building
of pier structure has three stages, there are bore pile jobs, pile cap jobs dan pier
jobs. Use each heavy equipment on the jobs less than maximum because production
capacity is still below the capacity of the equipment. On the foundry
implementations,the use of a truck mixer should be maximized in order to work more
efficiently
|