ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2 PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA
Traffic jam usual things that happen on intersection Jombor because of volume the vehicle who dense either into direction of Yogyakarta nor into outside of town. Jombor flyovers project is an effort made to overcome the congestion that occurs at the intersection of Jombor. Work implementation and an...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1797033690708049920 |
---|---|
author | , SOBITA MARCHKY PERMATASARI , Edi Kurniadi,ST.,MT. |
author_facet | , SOBITA MARCHKY PERMATASARI , Edi Kurniadi,ST.,MT. |
author_sort | , SOBITA MARCHKY PERMATASARI |
collection | UGM |
description | Traffic jam usual things that happen on intersection Jombor because of volume
the vehicle who dense either into direction of Yogyakarta nor into outside of town.
Jombor flyovers project is an effort made to overcome the congestion that occurs at
the intersection of Jombor.
Work implementation and analysis of heavy equipment production capacity in
pier R2 is the porpuse of this task report. The menthod used is observation,
interviews, literature, documentation and analysis. Where, the five indispensable in
the proscess of observation of work and analysis of heavy equipment production
capacity.
Based on the observations and analyzes can be concluded that in the building
of pier structure has three stages, there are bore pile jobs, pile cap jobs dan pier
jobs. Use each heavy equipment on the jobs less than maximum because production
capacity is still below the capacity of the equipment. On the foundry
implementations,the use of a truck mixer should be maximized in order to work more
efficiently |
first_indexed | 2024-03-13T22:58:19Z |
format | Thesis |
id | oai:generic.eprints.org:122058 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T22:58:19Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1220582016-03-04T08:43:20Z https://repository.ugm.ac.id/122058/ ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2 PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA , SOBITA MARCHKY PERMATASARI , Edi Kurniadi,ST.,MT. ETD Traffic jam usual things that happen on intersection Jombor because of volume the vehicle who dense either into direction of Yogyakarta nor into outside of town. Jombor flyovers project is an effort made to overcome the congestion that occurs at the intersection of Jombor. Work implementation and analysis of heavy equipment production capacity in pier R2 is the porpuse of this task report. The menthod used is observation, interviews, literature, documentation and analysis. Where, the five indispensable in the proscess of observation of work and analysis of heavy equipment production capacity. Based on the observations and analyzes can be concluded that in the building of pier structure has three stages, there are bore pile jobs, pile cap jobs dan pier jobs. Use each heavy equipment on the jobs less than maximum because production capacity is still below the capacity of the equipment. On the foundry implementations,the use of a truck mixer should be maximized in order to work more efficiently [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , SOBITA MARCHKY PERMATASARI and , Edi Kurniadi,ST.,MT. (2013) ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2 PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62157 |
spellingShingle | ETD , SOBITA MARCHKY PERMATASARI , Edi Kurniadi,ST.,MT. ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2 PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title | ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title_full | ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title_fullStr | ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title_full_unstemmed | ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title_short | ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA |
title_sort | analisis kapasitas produksi alat berat dan pelaksanaan pekerjaan struktur pier r2 proyek pembangunan flyover jombor yogyakarta |
topic | ETD |
work_keys_str_mv | AT sobitamarchkypermatasari analisiskapasitasproduksialatberatdanpelaksanaanpekerjaanstrukturpierr2proyekpembangunanflyoverjomboryogyakarta AT edikurniadistmt analisiskapasitasproduksialatberatdanpelaksanaanpekerjaanstrukturpierr2proyekpembangunanflyoverjomboryogyakarta |