PELAKSANAAN PEMASANGAN BENTANG GIRDER DUPLIKASI JEMBATAN MUSI II PALEMBANG

The difference of girder spans with the pier during the implementation on the field made an impact on the �Duplicate of Musi II Palembang Brige� construction process. Therefore, the girder spans should be adjusted with the pier that were already exist with the same distance. Thus, the implementa...

Full description

Bibliographic Details
Main Authors: , DINI WIDIANI, , Ir. Sindu Nuranto, MS.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Description
Summary:The difference of girder spans with the pier during the implementation on the field made an impact on the �Duplicate of Musi II Palembang Brige� construction process. Therefore, the girder spans should be adjusted with the pier that were already exist with the same distance. Thus, the implementation of girder installation can be continusd with less additional installation cost. Several approaches were made to find the most appropriate solution to solve the problems that had occured. The approaches could be seen from various aspects such as kind of installation,cost, construction period, and the value of the magnificience After the best solution being determined then girders on the pier installed by using crawler crane method. The analysis result of the selected solution has a similar structure with the plan. On the other hand, loading analysis being conducted refers to RSNI no T-02- 2005 to calculate the magnitude of the force assigned to the pier. Structural analysis conducted by �MIDAS� software to determine the value of the shear forces and moments so we get the kind of stirrups that can be used in the development process.