PELAKSANAAN PEMASANGAN BENTANG GIRDER DUPLIKASI JEMBATAN MUSI II PALEMBANG
The difference of girder spans with the pier during the implementation on the field made an impact on the �Duplicate of Musi II Palembang Brige� construction process. Therefore, the girder spans should be adjusted with the pier that were already exist with the same distance. Thus, the implementa...
Main Authors: | , DINI WIDIANI, , Ir. Sindu Nuranto, MS. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Similar Items
-
METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
by: , OKVIAWARNI EKAPUTRI, et al.
Published: (2014) -
ANALISIS STRUKTUR JEMBATAN GANTUNG SEDERHANA BENTANG 80 M
by: , RUBBY INDRA USMANTO, et al.
Published: (2013) -
Konflik pembangunan jembatan Musi III dan penggusuran Kampung ARab di Palembang
by: , TIATI, Ike Julies, et al.
Published: (2007) -
PERANCANGAN DAN PENDETAILAN KOMPONEN JEMBATAN GANTUNG PEJALAN KAKI BENTANG 80 METER
by: , AZIZ FAUZI, et al.
Published: (2013) -
PERANCANGAN JEMBATAN HYBRID PEJALAN KAKI KELAS I DENGAN BENTANG UTAMA 80 METER
by: , FRANSISKUS XAVERIUS PRISYAFADA, et al.
Published: (2014)