PERANCANGAN ULANG LAYOUT MOLDING PLANT UNTUK MENGURANGI JARAK PENGANGKUTAN DI PT. INGRESS MALINDO VENTURES
The increasing request of customer about production door frame and beltline make the company always to try customer need complete with increasing total production. To increase the total production, its mean the company need more machine and place, so the company build a new plant and the old plant m...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Summary: | The increasing request of customer about production door frame and
beltline make the company always to try customer need complete with increasing
total production. To increase the total production, its mean the company need
more machine and place, so the company build a new plant and the old plant must
be re-layout.
The method of re-layout design, collect file about flow process beltline,
dimension calculate from every mold machine (beltline producing) and interview
method. And then make alternative re-layout. the result of design from this method
then be compare with movement distance.
Space area is (11.8 x 6.8) m and (25.2 x 4.5) m. In part futura WSI FD
RH/LH, first layout have movement distance at 44336 meters per month whereas
in the new layout have movement distance at 29766 meters per month. In flow
process part WSO FR (futura) and part WSI FD material PVC (futura) faster |
---|