PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH
Tahu Makmur is one of many companies which still apply manual system in their production process. The company is located in Sragen, Central Java. To find the amount of time used during all operations, standard time calculation becomes necessary so that the company can calculate the number of tofu pr...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1826046815367069696 |
---|---|
author | , DAVID REGA FHEBRI H , Dr. Ir. Nafis Khuriyanti, STP. M.Agr. |
author_facet | , DAVID REGA FHEBRI H , Dr. Ir. Nafis Khuriyanti, STP. M.Agr. |
author_sort | , DAVID REGA FHEBRI H |
collection | UGM |
description | Tahu Makmur is one of many companies which still apply manual system
in their production process. The company is located in Sragen, Central Java. To
find the amount of time used during all operations, standard time calculation
becomes necessary so that the company can calculate the number of tofu
produced within a day.
In order that the standard time calculation can be conducted easily, the
step which should be taken is finding out the cycle time in each working station.
After that, data congruency and data adequacy tests are done. The next step will
be the determination and calculation of rating factor according to Westinghouse
system, also the normal time calculation.
Standard time calculation done on Sumber Makmur production process
shows the following data: 403.42 seconds on weighing process, 14,444.51
seconds on submersion, 838.88 seconds on washing, 136.75 seconds on milling,
295.23 seconds on boiling, 94.49 seconds on filtering, 427.92 seconds on
coagulation process, 230.91 on the first molding, 37.45 seconds on cutting, and
43.44 seconds on the second molding. |
first_indexed | 2024-03-13T22:59:21Z |
format | Thesis |
id | oai:generic.eprints.org:122392 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T22:59:21Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1223922016-03-04T08:29:34Z https://repository.ugm.ac.id/122392/ PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH , DAVID REGA FHEBRI H , Dr. Ir. Nafis Khuriyanti, STP. M.Agr. ETD Tahu Makmur is one of many companies which still apply manual system in their production process. The company is located in Sragen, Central Java. To find the amount of time used during all operations, standard time calculation becomes necessary so that the company can calculate the number of tofu produced within a day. In order that the standard time calculation can be conducted easily, the step which should be taken is finding out the cycle time in each working station. After that, data congruency and data adequacy tests are done. The next step will be the determination and calculation of rating factor according to Westinghouse system, also the normal time calculation. Standard time calculation done on Sumber Makmur production process shows the following data: 403.42 seconds on weighing process, 14,444.51 seconds on submersion, 838.88 seconds on washing, 136.75 seconds on milling, 295.23 seconds on boiling, 94.49 seconds on filtering, 427.92 seconds on coagulation process, 230.91 on the first molding, 37.45 seconds on cutting, and 43.44 seconds on the second molding. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , DAVID REGA FHEBRI H and , Dr. Ir. Nafis Khuriyanti, STP. M.Agr. (2013) PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62494 |
spellingShingle | ETD , DAVID REGA FHEBRI H , Dr. Ir. Nafis Khuriyanti, STP. M.Agr. PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title | PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title_full | PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title_fullStr | PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title_full_unstemmed | PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title_short | PENENTUAN WAKTU BAKU PROSES PRODUKSI TAHU DI CV. SUMBER MAKMUR, SRAGEN, JAWA TENGAH |
title_sort | penentuan waktu baku proses produksi tahu di cv sumber makmur sragen jawa tengah |
topic | ETD |
work_keys_str_mv | AT davidregafhebrih penentuanwaktubakuprosesproduksitahudicvsumbermakmursragenjawatengah AT drirnafiskhuriyantistpmagr penentuanwaktubakuprosesproduksitahudicvsumbermakmursragenjawatengah |