Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun

Preliminary design of this ethyl formate plant is intended to asses the feasibility of this plant. Ethyl formate plant is designed to fulfill 60.000 ton/year of capacity and to be operated continuously 330 days/year. In order to gain the ethyl formate product as designed capacity, 40043,53 ton/year...

Full description

Bibliographic Details
Main Authors: , SARFINA RAMADIANI, , Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1797033777559502848
author , SARFINA RAMADIANI
, Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng.
author_facet , SARFINA RAMADIANI
, Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng.
author_sort , SARFINA RAMADIANI
collection UGM
description Preliminary design of this ethyl formate plant is intended to asses the feasibility of this plant. Ethyl formate plant is designed to fulfill 60.000 ton/year of capacity and to be operated continuously 330 days/year. In order to gain the ethyl formate product as designed capacity, 40043,53 ton/year of ethanol 95% (w/w) and 40793,78 ton/year of formic acid 94% (w/w) are required as main raw materials. The sysntesis of ethyl formate is based on the esterification process and catalyzed by sulphuric acid. The reaction takes place in a reactive distillation column in atmospheric condition. Another distillation column is needed to further purify the ethyl formate product up to 98,6% (w/w) of concentration. To be constructed in Cilegon, Banten, this plant requires 12.000 m2 area and employs 216 labors. The consumed energy includes electricity of 1594607,09 kWh/year and 25604,08 m3/year of fuel oil. Moreover, the utility requires 26040,00 kg/hour of make-up water and 150 m3/hour of air instrument. Fixed capital costs $ 14,534,181.82 + Rp 88.444.256.897,33 and working capital costs $ 12,993,533.03 + Rp 239.401.583.121,16. Based on the economical feasibility study, this plant is classified as low risk chemical plant with 43,38% of ROI (before taxes)
first_indexed 2024-03-13T22:59:47Z
format Thesis
id oai:generic.eprints.org:122496
institution Universiti Gadjah Mada
last_indexed 2024-03-13T22:59:47Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1224962016-03-04T08:43:04Z https://repository.ugm.ac.id/122496/ Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun , SARFINA RAMADIANI , Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng. ETD Preliminary design of this ethyl formate plant is intended to asses the feasibility of this plant. Ethyl formate plant is designed to fulfill 60.000 ton/year of capacity and to be operated continuously 330 days/year. In order to gain the ethyl formate product as designed capacity, 40043,53 ton/year of ethanol 95% (w/w) and 40793,78 ton/year of formic acid 94% (w/w) are required as main raw materials. The sysntesis of ethyl formate is based on the esterification process and catalyzed by sulphuric acid. The reaction takes place in a reactive distillation column in atmospheric condition. Another distillation column is needed to further purify the ethyl formate product up to 98,6% (w/w) of concentration. To be constructed in Cilegon, Banten, this plant requires 12.000 m2 area and employs 216 labors. The consumed energy includes electricity of 1594607,09 kWh/year and 25604,08 m3/year of fuel oil. Moreover, the utility requires 26040,00 kg/hour of make-up water and 150 m3/hour of air instrument. Fixed capital costs $ 14,534,181.82 + Rp 88.444.256.897,33 and working capital costs $ 12,993,533.03 + Rp 239.401.583.121,16. Based on the economical feasibility study, this plant is classified as low risk chemical plant with 43,38% of ROI (before taxes) [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , SARFINA RAMADIANI and , Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng. (2013) Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62600
spellingShingle ETD
, SARFINA RAMADIANI
, Himawan Tri Bayu Murti Petrus, S.T., ME., D.Eng.
Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title_full Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title_fullStr Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title_full_unstemmed Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title_short Prarancangan Pabrik Etil Formiat dari Asam Formiat dan Etanol dengan Kapasitas 60.000 Ton/Tahun
title_sort prarancangan pabrik etil formiat dari asam formiat dan etanol dengan kapasitas 60 000 ton tahun
topic ETD
work_keys_str_mv AT sarfinaramadiani prarancanganpabriketilformiatdariasamformiatdanetanoldengankapasitas60000tontahun
AT himawantribayumurtipetrusstmedeng prarancanganpabriketilformiatdariasamformiatdanetanoldengankapasitas60000tontahun