Summary: | Civilian�s growing speed which to crowded especially in Indonesia, give
effect to infrastructure raise and development. Not exception Yogyakarta which a
tourism city, which domestic or foreign tourist. There for at joint North Ring Road
Yogyakarta and arterials road Yogyakarta � Magelang built Fly Over and
Underpass which have role to support continuity traffic flow.
The purpose of this report for knowing bearing capacity bored pile
foundation to restrain load from up. More over to knowing how to bored pile
foundation process its done.
In this report used observation, interview, literature, documentation, and
analysist methods (Meyerhoff).
Based of discussion result, the conclusion is analysist result from SPT is
565 ton, while PDA test result is 638 ton. So PDA test result is more than 73 ton or
12,92 % based analysist SPT result.
|