UNJUK KERJA MODEL HIDRAULIK 3 DIMENSI SETTLING POND BERBENTUK LINGKARAN SEBAGAI PEREDAM GELOMBANG STUDI KASUS : INTAKE PLTGU CILEGON
A combined cycle power plant is a common powerhouse in Indonesia Powerplant cooling was carried out from sea taken through a cooling water intake as an open channel. At the time of hurricane season (big waves) the intake turns out to deliver a sea waves into the door at the base of the intake. Besid...
Autori principali: | , MADE EDGALOYN, , Prof. Ir. Nur Yuwono, Dipl. HE., Ph.D. |
---|---|
Natura: | Tesi |
Pubblicazione: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Soggetti: |
Documenti analoghi
Documenti analoghi
-
Unjuk kerja peredam gelombang miring
di: , RANA, Amiruddin, et al.
Pubblicazione: (2001) -
Optimasi unjuk kerja peredam gelombang lengkung bergerigi di saluran gelombang (Wave Flume)
di: , GUNAWAN, Agus Irfan, et al.
Pubblicazione: (2002) -
Unjuk kerja peredam gelombang lengkung pada saluran gelombang
di: , FATHONI, Moechamad Agus Salim Al, et al.
Pubblicazione: (2001) -
Unjuk kerja terumbu buatan (artificial reef) sebagai peredam energi gelombang
di: , DHARMA, I Gusti Bagus Sila, et al.
Pubblicazione: (1994) -
Kajian stabilitas statis terumbu buatan (artificial reef) sebagai peredam energi gelombang
di: , MUNDRA, I Wayan, et al.
Pubblicazione: (1995)