UNJUK KERJA MODEL HIDRAULIK 3 DIMENSI SETTLING POND BERBENTUK LINGKARAN SEBAGAI PEREDAM GELOMBANG STUDI KASUS : INTAKE PLTGU CILEGON
A combined cycle power plant is a common powerhouse in Indonesia Powerplant cooling was carried out from sea taken through a cooling water intake as an open channel. At the time of hurricane season (big waves) the intake turns out to deliver a sea waves into the door at the base of the intake. Besid...
Κύριοι συγγραφείς: | , |
---|---|
Μορφή: | Thesis |
Έκδοση: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Θέματα: |