UNJUK KERJA MODEL HIDRAULIK 3 DIMENSI SETTLING POND BERBENTUK LINGKARAN SEBAGAI PEREDAM GELOMBANG STUDI KASUS : INTAKE PLTGU CILEGON

A combined cycle power plant is a common powerhouse in Indonesia Powerplant cooling was carried out from sea taken through a cooling water intake as an open channel. At the time of hurricane season (big waves) the intake turns out to deliver a sea waves into the door at the base of the intake. Besid...

Popoln opis

Bibliografske podrobnosti
Main Authors: , MADE EDGALOYN, , Prof. Ir. Nur Yuwono, Dipl. HE., Ph.D.
Format: Thesis
Izdano: [Yogyakarta] : Universitas Gadjah Mada 2013
Teme:
ETD