ANALISIS DAMPAK PEMBANGUNAN RUAS JALAN DI ATAS SUNGAI CODE TERHADAP KONDISI LALU LINTAS KAWASAN MALIOBORO

Malioboro is one of the tourism icon in Yogyakarta Province is very dense traffic conditions, especially during the holidays. The rapid growth of tourists who visit Malioboro coupled with an increase in the volume of vehicles in the city of Yogyakarta make congeseted in this area. Handling these are...

Full description

Bibliographic Details
Main Authors: , PRASETYO ARIEF WIBOWO, , Prof. Dr-Ing. Ir. Ahmad Munawar, M.Sc.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Description
Summary:Malioboro is one of the tourism icon in Yogyakarta Province is very dense traffic conditions, especially during the holidays. The rapid growth of tourists who visit Malioboro coupled with an increase in the volume of vehicles in the city of Yogyakarta make congeseted in this area. Handling these areas as much as possible to increase the convenience of tourists who visit the area of Malioboro . Oleha because keterbatsan land to increase the capacity of the road , came the idea to build a road over the River Code as current diversionary Malioboro street at once to increase road capacity in the city of Yogyakarta . The research was conducted by analyzing the existing conditions and conditions after construction of flyovers above Code River. The capacity and speed of calculation used is free MKJI 1997. This study uses TFTP aid program 1997. This study begins with the collection of data for the road network to be created modeling . Once the data is collected, making the road network on the basis of the existing condition . In addition to the road network , also takes origin destination matrix ( MAT ) . In this study , the data matrix origin destination (OD ) data taken from a trip in the city of Yogyakarta in 2008 is projected to the year 2012. Furthermore, the imposition of the road network . Result of the imposition of road networks then tested its validity. Once the validity of the value approach required value, then make a closing scenario Malioboro . The analysis shows that the existing condition Malioboro experiencing problems, which has a degree of saturation (DS) of 1.26 to Malioboro street while DS average of 0.52. After the construction of flyovers in the code stream , to Malioboro street of 1.26 while the DS is still the average dropped to 0.51 . The problems are then solved by closing Jalan Malioboro and make Pedestrian Zone . This case there is no impact on the roads are congested Malioboro .