ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG

Based on from the Ministry of Energy and Mineral Resources of Indonesia (KESDM) established in 2011 shows that there are 50 mining work area (WKP) that are scattered around this country. It shows how much potential electrical energy from geothermal sector is in Indonesia, although until now not all...

Full description

Bibliographic Details
Main Authors: , GILANG RIADI RAMADHANI, , Dr.-Ing. Sihana
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826047156685897728
author , GILANG RIADI RAMADHANI
, Dr.-Ing. Sihana
author_facet , GILANG RIADI RAMADHANI
, Dr.-Ing. Sihana
author_sort , GILANG RIADI RAMADHANI
collection UGM
description Based on from the Ministry of Energy and Mineral Resources of Indonesia (KESDM) established in 2011 shows that there are 50 mining work area (WKP) that are scattered around this country. It shows how much potential electrical energy from geothermal sector is in Indonesia, although until now not all WKP have officially operated yet. If we discuss about the utilization of geothermal energy, it will never exclude the waste of gas produced from the bowels of the earth. Gases such as carbon dioxide, hydrogen sulfide, methane, ammonia and other compounds are elements of noncondensable gas (NCG), which can affect the performance of the geothermal system. From load data verification 42 MW had been modeled in Cycle Tempo 5.0, ejector can be modeled with combination of valve and node. LRVP can be modeled with combination of valve and pump. From the modeled data verification with ejector in Cycle Tempo 5.0, produced nett power 34 MW while after modeling geothermal system with LRVP produced nett ower 37 MW. LRVP produced bigger nett power than ejector.
first_indexed 2024-03-13T23:05:55Z
format Thesis
id oai:generic.eprints.org:124093
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:05:55Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1240932016-03-04T08:37:31Z https://repository.ugm.ac.id/124093/ ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG , GILANG RIADI RAMADHANI , Dr.-Ing. Sihana ETD Based on from the Ministry of Energy and Mineral Resources of Indonesia (KESDM) established in 2011 shows that there are 50 mining work area (WKP) that are scattered around this country. It shows how much potential electrical energy from geothermal sector is in Indonesia, although until now not all WKP have officially operated yet. If we discuss about the utilization of geothermal energy, it will never exclude the waste of gas produced from the bowels of the earth. Gases such as carbon dioxide, hydrogen sulfide, methane, ammonia and other compounds are elements of noncondensable gas (NCG), which can affect the performance of the geothermal system. From load data verification 42 MW had been modeled in Cycle Tempo 5.0, ejector can be modeled with combination of valve and node. LRVP can be modeled with combination of valve and pump. From the modeled data verification with ejector in Cycle Tempo 5.0, produced nett power 34 MW while after modeling geothermal system with LRVP produced nett ower 37 MW. LRVP produced bigger nett power than ejector. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , GILANG RIADI RAMADHANI and , Dr.-Ing. Sihana (2013) ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64212
spellingShingle ETD
, GILANG RIADI RAMADHANI
, Dr.-Ing. Sihana
ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title_full ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title_fullStr ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title_full_unstemmed ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title_short ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
title_sort analisis kinerja liquid ring vacuum pump untuk penurunan tekanan kondenser utama pada sistem pembangkit panas bumi beban daya 42 mw pt geo dipa energi unit dieng
topic ETD
work_keys_str_mv AT gilangriadiramadhani analisiskinerjaliquidringvacuumpumpuntukpenurunantekanankondenserutamapadasistempembangkitpanasbumibebandaya42mwptgeodipaenergiunitdieng
AT dringsihana analisiskinerjaliquidringvacuumpumpuntukpenurunantekanankondenserutamapadasistempembangkitpanasbumibebandaya42mwptgeodipaenergiunitdieng