ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
Based on from the Ministry of Energy and Mineral Resources of Indonesia (KESDM) established in 2011 shows that there are 50 mining work area (WKP) that are scattered around this country. It shows how much potential electrical energy from geothermal sector is in Indonesia, although until now not all...
Main Authors: | , GILANG RIADI RAMADHANI, , Dr.-Ing. Sihana |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Similar Items
-
ANALISIS KINERJA EJEKTOR UNTUK EKSTRAKSI UAP KONDENSER UTAMA PADA PLTP 25 MW PT GEO DIPA ENERGI Ltd. DIENG
by: , RAHADIAN KUSUMA ADI PRATAMA, et al.
Published: (2013) -
PEMANFAATAN PANAS SISA BUANG BRINE PADA PT. GEO DIPA ENERGI Ltd. DIENG DENGAN SIKLUS RANKINE ORGANIK
by: , WISNU ANGGA SAKTI, et al.
Published: (2013) -
PERANCANGAN SISTEM PENDINGINAN BRINE PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP)
(STUDI KASUS : UNIT PRODUKSI PAD#29 PLTP PT. GEO DIPA ENERGI DIENG)
by: , PUNDY SAPUTRO, et al.
Published: (2013) -
ANALISIS PERFORMA MODEL ORGANIC RANKINE CYCLE (ORC) PADA PT. GEO DIPA ENERGI Ltd. DIENG DENGAN VARIASI MEDIUM KERJA
by: , ADIATIE SUCININGTYAS, et al.
Published: (2014) -
Biodiversity monitoring as a baseline for PROPER biodiversity protection program of PT. Geo Dipa Energi Dieng, Central Java,
Indonesia
by: Hadisusanto, Suwarno, et al.
Published: (2022)