DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)

Since found in 1821, electricity has become one of most important needs to do daily activities. As the increasing of population and economy activities, electricity demand will grow as well. Indonesia is a development country which still depend its electricity supply on oil and gas sources. Since the...

Full description

Bibliographic Details
Main Authors: , DINTANI Y N N, , Rachmawan Budiarto, S.T, M.T
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826047158828138496
author , DINTANI Y N N
, Rachmawan Budiarto, S.T, M.T
author_facet , DINTANI Y N N
, Rachmawan Budiarto, S.T, M.T
author_sort , DINTANI Y N N
collection UGM
description Since found in 1821, electricity has become one of most important needs to do daily activities. As the increasing of population and economy activities, electricity demand will grow as well. Indonesia is a development country which still depend its electricity supply on oil and gas sources. Since these sources can be diminished in any time, government should more invest on build renewable energy power plant. The main objective of this research is designing the first centralized biogas power plant that is suitable to be built in Bantul, Indonesia. This research is designed approaching to Linko Biogas Plants, Denmark. Parameters which are used to design this plant are feedstock type, hydraulic retention time, and temperature operation of digester. This plant utilizes gas turbine to generate electricity. To get the optimum electricity production, it varies the operation pressure of gas turbine. Manure, as feedstock for this plant, is collected from 8 sub-districts in Bantul. The farthest radius from plant site is Imogiri, that is 15 km. Manure is transported using 16 vacuum tankers which maximum capacity is 12,000 litres. All of feedstock will be mixed with water inside buffer tank. Then, digestion of this feedstock-water mixture takes place inside two stages digester, both are continuous flow type which is operates in mesophilic temperature (35oC). Total biogas yields from both digesters are 18,270 m3 per day. The raw biogas is being purified before it enters power generation stage. In power generation stage, gas turbine uses air as working fluid. Pressure ratio of air compressor is 10.50, whereas, pressure ratio for biogas compressor is higher by 1.1. The net electricity production of this plant is 963.42 kW per day.
first_indexed 2024-03-13T23:05:57Z
format Thesis
id oai:generic.eprints.org:124104
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:05:57Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1241042016-03-04T08:30:52Z https://repository.ugm.ac.id/124104/ DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA) , DINTANI Y N N , Rachmawan Budiarto, S.T, M.T ETD Since found in 1821, electricity has become one of most important needs to do daily activities. As the increasing of population and economy activities, electricity demand will grow as well. Indonesia is a development country which still depend its electricity supply on oil and gas sources. Since these sources can be diminished in any time, government should more invest on build renewable energy power plant. The main objective of this research is designing the first centralized biogas power plant that is suitable to be built in Bantul, Indonesia. This research is designed approaching to Linko Biogas Plants, Denmark. Parameters which are used to design this plant are feedstock type, hydraulic retention time, and temperature operation of digester. This plant utilizes gas turbine to generate electricity. To get the optimum electricity production, it varies the operation pressure of gas turbine. Manure, as feedstock for this plant, is collected from 8 sub-districts in Bantul. The farthest radius from plant site is Imogiri, that is 15 km. Manure is transported using 16 vacuum tankers which maximum capacity is 12,000 litres. All of feedstock will be mixed with water inside buffer tank. Then, digestion of this feedstock-water mixture takes place inside two stages digester, both are continuous flow type which is operates in mesophilic temperature (35oC). Total biogas yields from both digesters are 18,270 m3 per day. The raw biogas is being purified before it enters power generation stage. In power generation stage, gas turbine uses air as working fluid. Pressure ratio of air compressor is 10.50, whereas, pressure ratio for biogas compressor is higher by 1.1. The net electricity production of this plant is 963.42 kW per day. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , DINTANI Y N N and , Rachmawan Budiarto, S.T, M.T (2013) DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64223
spellingShingle ETD
, DINTANI Y N N
, Rachmawan Budiarto, S.T, M.T
DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title_full DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title_fullStr DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title_full_unstemmed DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title_short DESIGN OF CENTRALIZED BIOGAS POWER PLANT USING COWS MANURE (CASE STUDY IN BANTUL, INDONESIA)
title_sort design of centralized biogas power plant using cows manure case study in bantul indonesia
topic ETD
work_keys_str_mv AT dintaniynn designofcentralizedbiogaspowerplantusingcowsmanurecasestudyinbantulindonesia
AT rachmawanbudiartostmt designofcentralizedbiogaspowerplantusingcowsmanurecasestudyinbantulindonesia