ANALISIS KINERJA EJEKTOR UNTUK EKSTRAKSI UAP KONDENSER UTAMA PADA PLTP 25 MW PT GEO DIPA ENERGI Ltd. DIENG
Geothermal energy conversioninto electricityatGeoDipa Energy Ltd Dieng power plant use steam from the earth to rotating the turbine.Steam produced in PLTP GeoDipa EnergyLtd. Dieng�s wells has wet characteristic. So it, needs to separatethe vapor phase from mixed phaseon theseparator. Steamproduced...
Main Authors: | , RAHADIAN KUSUMA ADI PRATAMA, , Dr.-Ing. Sihana |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Similar Items
-
ANALISIS KINERJA LIQUID RING VACUUM PUMP UNTUK PENURUNAN TEKANAN KONDENSER UTAMA PADA SISTEM PEMBANGKIT PANAS BUMI BEBAN DAYA 42 MW PT GEO DIPA ENERGI UNIT DIENG
by: , GILANG RIADI RAMADHANI, et al.
Published: (2013) -
PEMANFAATAN PANAS SISA BUANG BRINE PADA PT. GEO DIPA ENERGI Ltd. DIENG DENGAN SIKLUS RANKINE ORGANIK
by: , WISNU ANGGA SAKTI, et al.
Published: (2013) -
ANALISIS PERFORMA MODEL ORGANIC RANKINE CYCLE (ORC) PADA PT. GEO DIPA ENERGI Ltd. DIENG DENGAN VARIASI MEDIUM KERJA
by: , ADIATIE SUCININGTYAS, et al.
Published: (2014) -
PERANCANGAN SISTEM PENDINGINAN BRINE PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP)
(STUDI KASUS : UNIT PRODUKSI PAD#29 PLTP PT. GEO DIPA ENERGI DIENG)
by: , PUNDY SAPUTRO, et al.
Published: (2013) -
Recovery silika amorf dari lumpur panas bumi PLTP Dieng
by: , PURWATMOKO, R. Heri, et al.
Published: (2009)