PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI
Electrical energy is a very important necessity in human life today, where almost all human needs associated with electricity. PLTM present as a micro power plant with abundant resources and low maintenance costs when compared to electricity generator with other resources. In Buleleng District, Bali...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1826047305665478656 |
---|---|
author | , ASHARI RACHMANDANI , Prof. Ir. Bambang Suhendro, M.sc. Ph.D. |
author_facet | , ASHARI RACHMANDANI , Prof. Ir. Bambang Suhendro, M.sc. Ph.D. |
author_sort | , ASHARI RACHMANDANI |
collection | UGM |
description | Electrical energy is a very important necessity in human life today, where
almost all human needs associated with electricity. PLTM present as a micro
power plant with abundant resources and low maintenance costs when compared
to electricity generator with other resources. In Buleleng District, Bali Province
flows river Tukad Daya which will be planned 2 pieces of turbines.
The results of the analysis of hydrologic discharge results with 74%
reliability is 1.4 m3 / s. Potential power awakened in turbin 1 is 1878 kW with a
height of fall (head) 152 m, and the second turbine produces 2620 kW with a high
fall (head) 210 m. PLTM Tukad has 2 sandtrap which have exact same dimension
with 90 of length and 5 m of width. It also has 2 headtank which also has the same
dimension with 6 m of length and 6 m of width.
With the construction of Tukad Daya micro power plant which is at a
relatively inaccessible location is expected to help provide electricity supply for
the community. As one kind of electrical energy generation with renewable
resources, namely water then Tukad Daya micro power plant is very enviromental
friendly and does not require significant operational cost
Key words: micro power plants, Tukad Daya , Micro power facility ,building
dimensions |
first_indexed | 2024-03-13T23:08:21Z |
format | Thesis |
id | oai:generic.eprints.org:124836 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T23:08:21Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1248362016-03-04T08:24:29Z https://repository.ugm.ac.id/124836/ PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI , ASHARI RACHMANDANI , Prof. Ir. Bambang Suhendro, M.sc. Ph.D. ETD Electrical energy is a very important necessity in human life today, where almost all human needs associated with electricity. PLTM present as a micro power plant with abundant resources and low maintenance costs when compared to electricity generator with other resources. In Buleleng District, Bali Province flows river Tukad Daya which will be planned 2 pieces of turbines. The results of the analysis of hydrologic discharge results with 74% reliability is 1.4 m3 / s. Potential power awakened in turbin 1 is 1878 kW with a height of fall (head) 152 m, and the second turbine produces 2620 kW with a high fall (head) 210 m. PLTM Tukad has 2 sandtrap which have exact same dimension with 90 of length and 5 m of width. It also has 2 headtank which also has the same dimension with 6 m of length and 6 m of width. With the construction of Tukad Daya micro power plant which is at a relatively inaccessible location is expected to help provide electricity supply for the community. As one kind of electrical energy generation with renewable resources, namely water then Tukad Daya micro power plant is very enviromental friendly and does not require significant operational cost Key words: micro power plants, Tukad Daya , Micro power facility ,building dimensions [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , ASHARI RACHMANDANI and , Prof. Ir. Bambang Suhendro, M.sc. Ph.D. (2013) PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=64996 |
spellingShingle | ETD , ASHARI RACHMANDANI , Prof. Ir. Bambang Suhendro, M.sc. Ph.D. PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title | PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title_full | PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title_fullStr | PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title_full_unstemmed | PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title_short | PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) TUKAD DAYA KABUPATEN BULELENG � BALI |
title_sort | perencanaan pembangkit listrik tenaga mini hidro pltm tukad daya kabupaten buleleng a�� bali |
topic | ETD |
work_keys_str_mv | AT asharirachmandani perencanaanpembangkitlistriktenagaminihidropltmtukaddayakabupatenbulelengabali AT profirbambangsuhendromscphd perencanaanpembangkitlistriktenagaminihidropltmtukaddayakabupatenbulelengabali |