ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN

Highway Development Projects Bogor Outer Ring Road has been planned since 2009. Then WiKA appointed to continue the development of this project on the elevated highway trough the Bogor City on Soleh Iskandar Street. This project is one of the major road projects to be built by WiKA, in addition to t...

Full description

Bibliographic Details
Main Authors: , RINALDI FAHREZA, , Nursyamsu Hidayat, ST., MT., Ph.D.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826047330983346176
author , RINALDI FAHREZA
, Nursyamsu Hidayat, ST., MT., Ph.D.
author_facet , RINALDI FAHREZA
, Nursyamsu Hidayat, ST., MT., Ph.D.
author_sort , RINALDI FAHREZA
collection UGM
description Highway Development Projects Bogor Outer Ring Road has been planned since 2009. Then WiKA appointed to continue the development of this project on the elevated highway trough the Bogor City on Soleh Iskandar Street. This project is one of the major road projects to be built by WiKA, in addition to the great value of contract, the project is also located in the city center. So the success of this project will have a major impact for WiKA. System span-by-span precast box girder erection method using launching gantry with external. stressing is the alternative design propossed WiKA, from balance cantilever method with internal stressing as the original design. WiKA was appointed as the winner after a trough assessment of the technical aspects and cost aspects. The intent and purpose built Highway Road Bogor Outer Ring Road is the solution of the congestion Bogor City which require a shorter access road network compared else to go to the Jagorawi Highway as the main liaison between Bogor and Jakarta City. While the intent and purpose of apprenticeship in the execution of this project is basically to have a visual experience shapes the development of physical activity in the field of civil engineering, physical activity knows stages of development, management implementation in the field know and understand the practice in the field as the result of applying the theory. Concentration for the implementation of this internship will generally describe precast box girder erection method using launching gantry with system span-by-span.
first_indexed 2024-03-13T23:08:45Z
format Thesis
id oai:generic.eprints.org:124965
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:08:45Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1249652016-03-04T08:42:25Z https://repository.ugm.ac.id/124965/ ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN , RINALDI FAHREZA , Nursyamsu Hidayat, ST., MT., Ph.D. ETD Highway Development Projects Bogor Outer Ring Road has been planned since 2009. Then WiKA appointed to continue the development of this project on the elevated highway trough the Bogor City on Soleh Iskandar Street. This project is one of the major road projects to be built by WiKA, in addition to the great value of contract, the project is also located in the city center. So the success of this project will have a major impact for WiKA. System span-by-span precast box girder erection method using launching gantry with external. stressing is the alternative design propossed WiKA, from balance cantilever method with internal stressing as the original design. WiKA was appointed as the winner after a trough assessment of the technical aspects and cost aspects. The intent and purpose built Highway Road Bogor Outer Ring Road is the solution of the congestion Bogor City which require a shorter access road network compared else to go to the Jagorawi Highway as the main liaison between Bogor and Jakarta City. While the intent and purpose of apprenticeship in the execution of this project is basically to have a visual experience shapes the development of physical activity in the field of civil engineering, physical activity knows stages of development, management implementation in the field know and understand the practice in the field as the result of applying the theory. Concentration for the implementation of this internship will generally describe precast box girder erection method using launching gantry with system span-by-span. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , RINALDI FAHREZA and , Nursyamsu Hidayat, ST., MT., Ph.D. (2013) ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65129
spellingShingle ETD
, RINALDI FAHREZA
, Nursyamsu Hidayat, ST., MT., Ph.D.
ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title_full ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title_fullStr ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title_full_unstemmed ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title_short ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT LAUNCHING GANTRY DENGAN SISTEM SPAN � BY � SPAN
title_sort erection precast box girder menggunakan alat launching gantry dengan sistem span a�� by a�� span
topic ETD
work_keys_str_mv AT rinaldifahreza erectionprecastboxgirdermenggunakanalatlaunchinggantrydengansistemspanabyaspan
AT nursyamsuhidayatstmtphd erectionprecastboxgirdermenggunakanalatlaunchinggantrydengansistemspanabyaspan