PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
Facility layout has enough significant impact to company performances such as costs, work-in process inventory, lead times, productivity, and delivery performance. Good design of facility layout will capable to improve effectiveness and efficient through decreasing distance of transport material and...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1797034279334576128 |
---|---|
author | , GHORA HERYUDHA PUTRA , Sugiyanto, ST., M.Eng. |
author_facet | , GHORA HERYUDHA PUTRA , Sugiyanto, ST., M.Eng. |
author_sort | , GHORA HERYUDHA PUTRA |
collection | UGM |
description | Facility layout has enough significant impact to company performances
such as costs, work-in process inventory, lead times, productivity, and delivery
performance. Good design of facility layout will capable to improve effectiveness
and efficient through decreasing distance of transport material and increasing of
satisfaction human resource.
In this a research of facility layout held in PT. Inti Ganda Perdana. Based
of existing problems, facility layout planning was done by cellular manufacturing
systems method, that is grouping or clustering of product having equality of
design or equality of manufaktur characteristic or merger from both
The results of research were obtained that Relayout better than existing
layout. Relayout has distance smaller than existing layout. The rectilinear
distance reduced 40 m or 13.36% to existing layout, and also with decreasing
wasting time because unstable material handling. |
first_indexed | 2024-03-13T23:08:51Z |
format | Thesis |
id | oai:generic.eprints.org:124984 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T23:08:51Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1249842016-03-04T08:37:25Z https://repository.ugm.ac.id/124984/ PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 , GHORA HERYUDHA PUTRA , Sugiyanto, ST., M.Eng. ETD Facility layout has enough significant impact to company performances such as costs, work-in process inventory, lead times, productivity, and delivery performance. Good design of facility layout will capable to improve effectiveness and efficient through decreasing distance of transport material and increasing of satisfaction human resource. In this a research of facility layout held in PT. Inti Ganda Perdana. Based of existing problems, facility layout planning was done by cellular manufacturing systems method, that is grouping or clustering of product having equality of design or equality of manufaktur characteristic or merger from both The results of research were obtained that Relayout better than existing layout. Relayout has distance smaller than existing layout. The rectilinear distance reduced 40 m or 13.36% to existing layout, and also with decreasing wasting time because unstable material handling. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , GHORA HERYUDHA PUTRA and , Sugiyanto, ST., M.Eng. (2013) PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65148 |
spellingShingle | ETD , GHORA HERYUDHA PUTRA , Sugiyanto, ST., M.Eng. PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title | PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title_full | PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title_fullStr | PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title_full_unstemmed | PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title_short | PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 |
title_sort | perencanaan tata letak machining 2 di pt inti ganda perdana group plant 4 |
topic | ETD |
work_keys_str_mv | AT ghoraheryudhaputra perencanaantataletakmachining2diptintigandaperdanagroupplant4 AT sugiyantostmeng perencanaantataletakmachining2diptintigandaperdanagroupplant4 |