PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4

Facility layout has enough significant impact to company performances such as costs, work-in process inventory, lead times, productivity, and delivery performance. Good design of facility layout will capable to improve effectiveness and efficient through decreasing distance of transport material and...

Full description

Bibliographic Details
Main Authors: , GHORA HERYUDHA PUTRA, , Sugiyanto, ST., M.Eng.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1797034279334576128
author , GHORA HERYUDHA PUTRA
, Sugiyanto, ST., M.Eng.
author_facet , GHORA HERYUDHA PUTRA
, Sugiyanto, ST., M.Eng.
author_sort , GHORA HERYUDHA PUTRA
collection UGM
description Facility layout has enough significant impact to company performances such as costs, work-in process inventory, lead times, productivity, and delivery performance. Good design of facility layout will capable to improve effectiveness and efficient through decreasing distance of transport material and increasing of satisfaction human resource. In this a research of facility layout held in PT. Inti Ganda Perdana. Based of existing problems, facility layout planning was done by cellular manufacturing systems method, that is grouping or clustering of product having equality of design or equality of manufaktur characteristic or merger from both The results of research were obtained that Relayout better than existing layout. Relayout has distance smaller than existing layout. The rectilinear distance reduced 40 m or 13.36% to existing layout, and also with decreasing wasting time because unstable material handling.
first_indexed 2024-03-13T23:08:51Z
format Thesis
id oai:generic.eprints.org:124984
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:08:51Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1249842016-03-04T08:37:25Z https://repository.ugm.ac.id/124984/ PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4 , GHORA HERYUDHA PUTRA , Sugiyanto, ST., M.Eng. ETD Facility layout has enough significant impact to company performances such as costs, work-in process inventory, lead times, productivity, and delivery performance. Good design of facility layout will capable to improve effectiveness and efficient through decreasing distance of transport material and increasing of satisfaction human resource. In this a research of facility layout held in PT. Inti Ganda Perdana. Based of existing problems, facility layout planning was done by cellular manufacturing systems method, that is grouping or clustering of product having equality of design or equality of manufaktur characteristic or merger from both The results of research were obtained that Relayout better than existing layout. Relayout has distance smaller than existing layout. The rectilinear distance reduced 40 m or 13.36% to existing layout, and also with decreasing wasting time because unstable material handling. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , GHORA HERYUDHA PUTRA and , Sugiyanto, ST., M.Eng. (2013) PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65148
spellingShingle ETD
, GHORA HERYUDHA PUTRA
, Sugiyanto, ST., M.Eng.
PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title_full PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title_fullStr PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title_full_unstemmed PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title_short PERENCANAAN TATA LETAK MACHINING 2 DI PT. INTI GANDA PERDANA GROUP PLANT 4
title_sort perencanaan tata letak machining 2 di pt inti ganda perdana group plant 4
topic ETD
work_keys_str_mv AT ghoraheryudhaputra perencanaantataletakmachining2diptintigandaperdanagroupplant4
AT sugiyantostmeng perencanaantataletakmachining2diptintigandaperdanagroupplant4