PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA

Basement construction is an economical and efficient solution to overcome the limitations of area/land needed to build or to construct a building, especially the high rise building. In the implementation, basement construction as an underground structure must calculate and pay attention to technical...

Full description

Bibliographic Details
Main Authors: , HERJUNA WIDHI ARYA DWIUTAMA, , Ir. Hotma Prawoto S, MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1797034338729066496
author , HERJUNA WIDHI ARYA DWIUTAMA
, Ir. Hotma Prawoto S, MT.
author_facet , HERJUNA WIDHI ARYA DWIUTAMA
, Ir. Hotma Prawoto S, MT.
author_sort , HERJUNA WIDHI ARYA DWIUTAMA
collection UGM
description Basement construction is an economical and efficient solution to overcome the limitations of area/land needed to build or to construct a building, especially the high rise building. In the implementation, basement construction as an underground structure must calculate and pay attention to technical aspects, the environmental aspects are also an important aspect on the basement construction. The selection of the retaining wall construction specifications are the most important aspect to build the basement. The Mandiri (Solo) Office Building Project is using the Contiguous Pile construction as the retaining wall. Those Contiguous Piles are constructed using the mixed concrete with K-175 specification and with 800 mm on the size of the diameter. From the result of the basement construction calculation obtained that the turap is 24,2 m on the length and with 85 cm on thickness which is safe to be used on this basement construction, and for the pile capacity support (Qall) is 32,7 Ton and 2.128 kN. Meanwhile, the flowrate of the pump (Qp) is 5,93 lt/s with 1,5 � 2 pk on the power. And to hold the force caused by the pressure of water to come up, the dimension design of the work floor is 1 m.
first_indexed 2024-03-13T23:09:55Z
format Thesis
id oai:generic.eprints.org:125281
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:09:55Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1252812016-03-04T08:38:32Z https://repository.ugm.ac.id/125281/ PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA , HERJUNA WIDHI ARYA DWIUTAMA , Ir. Hotma Prawoto S, MT. ETD Basement construction is an economical and efficient solution to overcome the limitations of area/land needed to build or to construct a building, especially the high rise building. In the implementation, basement construction as an underground structure must calculate and pay attention to technical aspects, the environmental aspects are also an important aspect on the basement construction. The selection of the retaining wall construction specifications are the most important aspect to build the basement. The Mandiri (Solo) Office Building Project is using the Contiguous Pile construction as the retaining wall. Those Contiguous Piles are constructed using the mixed concrete with K-175 specification and with 800 mm on the size of the diameter. From the result of the basement construction calculation obtained that the turap is 24,2 m on the length and with 85 cm on thickness which is safe to be used on this basement construction, and for the pile capacity support (Qall) is 32,7 Ton and 2.128 kN. Meanwhile, the flowrate of the pump (Qp) is 5,93 lt/s with 1,5 � 2 pk on the power. And to hold the force caused by the pressure of water to come up, the dimension design of the work floor is 1 m. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , HERJUNA WIDHI ARYA DWIUTAMA and , Ir. Hotma Prawoto S, MT. (2013) PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65447
spellingShingle ETD
, HERJUNA WIDHI ARYA DWIUTAMA
, Ir. Hotma Prawoto S, MT.
PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title_full PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title_fullStr PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title_full_unstemmed PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title_short PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
title_sort pelaksanaan konstruksi basement pada proyek gedung kantor mandiri area solo pt adhi karya
topic ETD
work_keys_str_mv AT herjunawidhiaryadwiutama pelaksanaankonstruksibasementpadaproyekgedungkantormandiriareasoloptadhikarya
AT irhotmaprawotosmt pelaksanaankonstruksibasementpadaproyekgedungkantormandiriareasoloptadhikarya