PEMBUATAN PROGRAM FILTER BUDGETING SCHEDULE
Plant Departement constitutes one of the department existed at PT. Asmin Koalindo Tuhup is commisioned performs heavy equipment preserve that belong to the corporate. In preserve process there are some task subject that shall be performed by a planner, one of it� s the filter requirement for heavy...
Main Authors: | , GATOT RANGGATAMA, , Ir. Eko Wismo., M.Sc., Ph.D. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
Similar Items
-
PEMBUATAN MESIN PENGGULUNG KOIL OTOMATIS PT. SELAMAT SEMPURNA, Tbk.
by: , DEVANDIA RIKO C.K, et al.
Published: (2014) -
Studi pembuatan Biodiesel dari berbagai minyak nabati dengan metode Batch Single Stage Process dan pengujiannya terhadap unjuk kerja mesin diesel
by: , MARJITO, et al.
Published: (2006) -
Pembuatan program aplikasi bangunan sipil pembangkit listrik tenaga mikrohidro
by: , JUMIYANTO, et al.
Published: (2010) -
PENGUKURAN DAN STANDARISASI KOMPONEN FRONT ATTACHMENT PADA EXCAVATOR HITACHI UNIT EX 2500-6
by: , ANDRI, et al.
Published: (2014) -
REKONDISI MESIN 50T KV 2RT DARI SISTEM ORING MENJADI PRESS CURE RUBBER
by: , IMANUEL RENDY ADRIADI, et al.
Published: (2014)