PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN

Recently Indonesia have a large critical areas and should be solved immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends on their plan that should be transparent, responsible, participatory, comprehensive, and adapt local environment. FLR is a system problem, that need a...

Full description

Bibliographic Details
Main Authors: , EKA LESTARI, , Ir. Siswantoyo Dipodiningrat, M.S
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826047522473246720
author , EKA LESTARI
, Ir. Siswantoyo Dipodiningrat, M.S
author_facet , EKA LESTARI
, Ir. Siswantoyo Dipodiningrat, M.S
author_sort , EKA LESTARI
collection UGM
description Recently Indonesia have a large critical areas and should be solved immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends on their plan that should be transparent, responsible, participatory, comprehensive, and adapt local environment. FLR is a system problem, that need a systems-based method which integrate biophysical and social aspects. CASM is alternative methods that meets this criteria. On the implementation, the efficiency of this method need identification of interactivity relations through their networks. These networks are able to identify the total allocation time, human resource needs and FLR budget. The method used for building the networks on this research is the critical path method (CPM). The data required are the activities, predecessor activities, and normal time activities. These research results are network planning of FLR location identification has 31 activities with 120 series connection, 5 parallel connections, and 39 interactivity dependences. The total time required is 136 days effective or 6 months. The human resources needed 5 experts, 2 administrative staff, 2 cartographer, 10 field surveyors, and 10 surveyor assistants. The budget components are direct and indirect relates to the network, there are cost of honorarium, transportation, materials, business travel, meeting expenses, etc.
first_indexed 2024-03-13T23:12:11Z
format Thesis
id oai:generic.eprints.org:125924
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:12:11Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1259242016-03-04T08:33:09Z https://repository.ugm.ac.id/125924/ PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN , EKA LESTARI , Ir. Siswantoyo Dipodiningrat, M.S ETD Recently Indonesia have a large critical areas and should be solved immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends on their plan that should be transparent, responsible, participatory, comprehensive, and adapt local environment. FLR is a system problem, that need a systems-based method which integrate biophysical and social aspects. CASM is alternative methods that meets this criteria. On the implementation, the efficiency of this method need identification of interactivity relations through their networks. These networks are able to identify the total allocation time, human resource needs and FLR budget. The method used for building the networks on this research is the critical path method (CPM). The data required are the activities, predecessor activities, and normal time activities. These research results are network planning of FLR location identification has 31 activities with 120 series connection, 5 parallel connections, and 39 interactivity dependences. The total time required is 136 days effective or 6 months. The human resources needed 5 experts, 2 administrative staff, 2 cartographer, 10 field surveyors, and 10 surveyor assistants. The budget components are direct and indirect relates to the network, there are cost of honorarium, transportation, materials, business travel, meeting expenses, etc. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , EKA LESTARI and , Ir. Siswantoyo Dipodiningrat, M.S (2013) PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=66106
spellingShingle ETD
, EKA LESTARI
, Ir. Siswantoyo Dipodiningrat, M.S
PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title_full PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title_fullStr PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title_full_unstemmed PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title_short PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
title_sort perencanaan jaringan kerja dan anggaran untuk perencanaan lokasi rehabilitasi hutan dan lahan
topic ETD
work_keys_str_mv AT ekalestari perencanaanjaringankerjadananggaranuntukperencanaanlokasirehabilitasihutandanlahan
AT irsiswantoyodipodiningratms perencanaanjaringankerjadananggaranuntukperencanaanlokasirehabilitasihutandanlahan