PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN
Recently Indonesia have a large critical areas and should be solved immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends on their plan that should be transparent, responsible, participatory, comprehensive, and adapt local environment. FLR is a system problem, that need a...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1826047522473246720 |
---|---|
author | , EKA LESTARI , Ir. Siswantoyo Dipodiningrat, M.S |
author_facet | , EKA LESTARI , Ir. Siswantoyo Dipodiningrat, M.S |
author_sort | , EKA LESTARI |
collection | UGM |
description | Recently Indonesia have a large critical areas and should be solved
immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends
on their plan that should be transparent, responsible, participatory, comprehensive,
and adapt local environment. FLR is a system problem, that need a systems-based
method which integrate biophysical and social aspects. CASM is alternative methods
that meets this criteria. On the implementation, the efficiency of this method need
identification of interactivity relations through their networks. These networks are
able to identify the total allocation time, human resource needs and FLR budget.
The method used for building the networks on this research is the critical path
method (CPM). The data required are the activities, predecessor activities, and
normal time activities.
These research results are network planning of FLR location identification has
31 activities with 120 series connection, 5 parallel connections, and 39 interactivity
dependences. The total time required is 136 days effective or 6 months. The human
resources needed 5 experts, 2 administrative staff, 2 cartographer, 10 field surveyors,
and 10 surveyor assistants. The budget components are direct and indirect relates to
the network, there are cost of honorarium, transportation, materials, business travel,
meeting expenses, etc. |
first_indexed | 2024-03-13T23:12:11Z |
format | Thesis |
id | oai:generic.eprints.org:125924 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T23:12:11Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1259242016-03-04T08:33:09Z https://repository.ugm.ac.id/125924/ PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN , EKA LESTARI , Ir. Siswantoyo Dipodiningrat, M.S ETD Recently Indonesia have a large critical areas and should be solved immediately with Forest and Land Rehabilitation (FLR). The success of FLR depends on their plan that should be transparent, responsible, participatory, comprehensive, and adapt local environment. FLR is a system problem, that need a systems-based method which integrate biophysical and social aspects. CASM is alternative methods that meets this criteria. On the implementation, the efficiency of this method need identification of interactivity relations through their networks. These networks are able to identify the total allocation time, human resource needs and FLR budget. The method used for building the networks on this research is the critical path method (CPM). The data required are the activities, predecessor activities, and normal time activities. These research results are network planning of FLR location identification has 31 activities with 120 series connection, 5 parallel connections, and 39 interactivity dependences. The total time required is 136 days effective or 6 months. The human resources needed 5 experts, 2 administrative staff, 2 cartographer, 10 field surveyors, and 10 surveyor assistants. The budget components are direct and indirect relates to the network, there are cost of honorarium, transportation, materials, business travel, meeting expenses, etc. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , EKA LESTARI and , Ir. Siswantoyo Dipodiningrat, M.S (2013) PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=66106 |
spellingShingle | ETD , EKA LESTARI , Ir. Siswantoyo Dipodiningrat, M.S PERENCANAAN JARINGAN KERJA DAN ANGGARAN UNTUK PERENCANAAN LOKASI REHABILITASI HUTAN DAN LAHAN |
title | PERENCANAAN JARINGAN KERJA DAN ANGGARAN
UNTUK PERENCANAAN LOKASI REHABILITASI
HUTAN DAN LAHAN |
title_full | PERENCANAAN JARINGAN KERJA DAN ANGGARAN
UNTUK PERENCANAAN LOKASI REHABILITASI
HUTAN DAN LAHAN |
title_fullStr | PERENCANAAN JARINGAN KERJA DAN ANGGARAN
UNTUK PERENCANAAN LOKASI REHABILITASI
HUTAN DAN LAHAN |
title_full_unstemmed | PERENCANAAN JARINGAN KERJA DAN ANGGARAN
UNTUK PERENCANAAN LOKASI REHABILITASI
HUTAN DAN LAHAN |
title_short | PERENCANAAN JARINGAN KERJA DAN ANGGARAN
UNTUK PERENCANAAN LOKASI REHABILITASI
HUTAN DAN LAHAN |
title_sort | perencanaan jaringan kerja dan anggaran untuk perencanaan lokasi rehabilitasi hutan dan lahan |
topic | ETD |
work_keys_str_mv | AT ekalestari perencanaanjaringankerjadananggaranuntukperencanaanlokasirehabilitasihutandanlahan AT irsiswantoyodipodiningratms perencanaanjaringankerjadananggaranuntukperencanaanlokasirehabilitasihutandanlahan |