PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)

PT Industri Sandang Nusantara Unit Patal Secang is a company which produces yarn. Production activities at the company consists of three main stages, namely pre-spinning, spinning, and finishing. The three stages have potential hazards that threaten the safety and health of workers. This study aims...

Full description

Bibliographic Details
Main Authors: , ADRA SEPTYANINDHEA, , Ir. Guntarti Tatik Mulyati, MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1826047717640503296
author , ADRA SEPTYANINDHEA
, Ir. Guntarti Tatik Mulyati, MT.
author_facet , ADRA SEPTYANINDHEA
, Ir. Guntarti Tatik Mulyati, MT.
author_sort , ADRA SEPTYANINDHEA
collection UGM
description PT Industri Sandang Nusantara Unit Patal Secang is a company which produces yarn. Production activities at the company consists of three main stages, namely pre-spinning, spinning, and finishing. The three stages have potential hazards that threaten the safety and health of workers. This study aims to determine the level of risk of harm in the production process and the results are used to develop appropriate risk control recommendations for the company. In this research, the risk of hazards is assessed and the recommendations to reduce the impact of risk are developed through HIRARC (Hazard Identification, Risk Assessment, and Risk Control) approach. Hazard identification is done on the three main stages of the production process with Job Safety Analysis (JSA). Risk mapping is done to establish risk management priorities among the three main stages of the production process. Risk assessment performed on the stages of production that became priority on the risk map. The process of risk assessment refers to hazards that have been identified with JSA. The results showed the hazards which exists on the production process consists of mechanical hazards, physical hazards, chemical hazards, and ergonomic hazards. Risk map for the spinning stage shows that there are hazards that lies in the first quadrant so that the spinning stage become priority in the development of recommendations for risk control. The results of risk assessment indicates the highest risk are the hazard of noise exposure (risk value 15), sandwiched to carding and drawing machine (12), fiber dust exposure (10), fell from the footrest of carding and drawing machine (8), and crushed by the bobbins in ring spinning process (8). Recommendations given to reduce the risk level are to replace equipment or substitution, redesign of the workplace, as well as perform administrative control.
first_indexed 2024-03-13T23:15:18Z
format Thesis
id oai:generic.eprints.org:126893
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:15:18Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1268932016-03-04T07:51:40Z https://repository.ugm.ac.id/126893/ PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang) , ADRA SEPTYANINDHEA , Ir. Guntarti Tatik Mulyati, MT. ETD PT Industri Sandang Nusantara Unit Patal Secang is a company which produces yarn. Production activities at the company consists of three main stages, namely pre-spinning, spinning, and finishing. The three stages have potential hazards that threaten the safety and health of workers. This study aims to determine the level of risk of harm in the production process and the results are used to develop appropriate risk control recommendations for the company. In this research, the risk of hazards is assessed and the recommendations to reduce the impact of risk are developed through HIRARC (Hazard Identification, Risk Assessment, and Risk Control) approach. Hazard identification is done on the three main stages of the production process with Job Safety Analysis (JSA). Risk mapping is done to establish risk management priorities among the three main stages of the production process. Risk assessment performed on the stages of production that became priority on the risk map. The process of risk assessment refers to hazards that have been identified with JSA. The results showed the hazards which exists on the production process consists of mechanical hazards, physical hazards, chemical hazards, and ergonomic hazards. Risk map for the spinning stage shows that there are hazards that lies in the first quadrant so that the spinning stage become priority in the development of recommendations for risk control. The results of risk assessment indicates the highest risk are the hazard of noise exposure (risk value 15), sandwiched to carding and drawing machine (12), fiber dust exposure (10), fell from the footrest of carding and drawing machine (8), and crushed by the bobbins in ring spinning process (8). Recommendations given to reduce the risk level are to replace equipment or substitution, redesign of the workplace, as well as perform administrative control. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ADRA SEPTYANINDHEA and , Ir. Guntarti Tatik Mulyati, MT. (2014) PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67130
spellingShingle ETD
, ADRA SEPTYANINDHEA
, Ir. Guntarti Tatik Mulyati, MT.
PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title_full PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title_fullStr PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title_full_unstemmed PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title_short PENGENDALIAN RISIKO KECELAKAAN KERJA PADA BAGIAN PRODUKSI BERDASARKAN HASIL ANALISIS HAZARD IDENTIFICATION, RISK ASSESSMENT, AND RISK CONTROL (HIRARC) (Kasus PT Industri Sandang Nusantara Unit Patal Secang)
title_sort pengendalian risiko kecelakaan kerja pada bagian produksi berdasarkan hasil analisis hazard identification risk assessment and risk control hirarc kasus pt industri sandang nusantara unit patal secang
topic ETD
work_keys_str_mv AT adraseptyanindhea pengendalianrisikokecelakaankerjapadabagianproduksiberdasarkanhasilanalisishazardidentificationriskassessmentandriskcontrolhirarckasusptindustrisandangnusantaraunitpatalsecang
AT irguntartitatikmulyatimt pengendalianrisikokecelakaankerjapadabagianproduksiberdasarkanhasilanalisishazardidentificationriskassessmentandriskcontrolhirarckasusptindustrisandangnusantaraunitpatalsecang