METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A

Foundation is a part of building construction for building serves to put forward the load is distributed from top to subgrade. Foundation structure have to strong to hold this load without the occerrence of differential settlementon the system structure. The purpose of this study was to determine th...

Full description

Bibliographic Details
Main Authors: , ANDREAS S. S SIRAIT, , Edi Kurniadi, ST,MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797034821651791872
author , ANDREAS S. S SIRAIT
, Edi Kurniadi, ST,MT.
author_facet , ANDREAS S. S SIRAIT
, Edi Kurniadi, ST,MT.
author_sort , ANDREAS S. S SIRAIT
collection UGM
description Foundation is a part of building construction for building serves to put forward the load is distributed from top to subgrade. Foundation structure have to strong to hold this load without the occerrence of differential settlementon the system structure. The purpose of this study was to determine the spun pile foundation and the methodology used to analyze the prisoner axial pile using SPT data from the field test in three (3) different points. Analyzes were performed using the method Mayerhoff. Where the results of calculations performed it is known axial pile resistance value has a different values, namely to DB-1 at 1187.1 kN, for DB-2 1071.3 kN, and for DB-3 is equal to 1080 kN. So it can be concluded that the known value of the pile axial pile foundation as it can be determine what to wear in order to be able to withstand the load to be carried by the foundation.
first_indexed 2024-03-13T23:17:55Z
format Thesis
id oai:generic.eprints.org:127650
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:17:55Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1276502016-03-04T07:52:10Z https://repository.ugm.ac.id/127650/ METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A , ANDREAS S. S SIRAIT , Edi Kurniadi, ST,MT. ETD Foundation is a part of building construction for building serves to put forward the load is distributed from top to subgrade. Foundation structure have to strong to hold this load without the occerrence of differential settlementon the system structure. The purpose of this study was to determine the spun pile foundation and the methodology used to analyze the prisoner axial pile using SPT data from the field test in three (3) different points. Analyzes were performed using the method Mayerhoff. Where the results of calculations performed it is known axial pile resistance value has a different values, namely to DB-1 at 1187.1 kN, for DB-2 1071.3 kN, and for DB-3 is equal to 1080 kN. So it can be concluded that the known value of the pile axial pile foundation as it can be determine what to wear in order to be able to withstand the load to be carried by the foundation. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ANDREAS S. S SIRAIT and , Edi Kurniadi, ST,MT. (2014) METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67918
spellingShingle ETD
, ANDREAS S. S SIRAIT
, Edi Kurniadi, ST,MT.
METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_full METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_fullStr METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_full_unstemmed METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_short METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_sort metode pelaksanaan pondasi tiang pancang pada proyek apartement grand dhika city bekasi sektor 2a
topic ETD
work_keys_str_mv AT andreassssirait metodepelaksanaanpondasitiangpancangpadaproyekapartementgranddhikacitybekasisektor2a
AT edikurniadistmt metodepelaksanaanpondasitiangpancangpadaproyekapartementgranddhikacitybekasisektor2a