TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN

Carbon black plant of heavy oil is design with a capacity of 100,000 tons/year through the furnace combustion process in the two pieces of furnace reaktor, which are arrange parallel Gravley. The reaction occurs at a pressure of 9.914 atm at a temperature of 1200 to 1700 °C. Heavy oil as fuel 126,9...

Full description

Bibliographic Details
Main Authors: , NANDA ANGGAKARA, , Prof. Ir. Suryo Purwono, MA.Sc., Ph.D.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826047915596972032
author , NANDA ANGGAKARA
, Prof. Ir. Suryo Purwono, MA.Sc., Ph.D.
author_facet , NANDA ANGGAKARA
, Prof. Ir. Suryo Purwono, MA.Sc., Ph.D.
author_sort , NANDA ANGGAKARA
collection UGM
description Carbon black plant of heavy oil is design with a capacity of 100,000 tons/year through the furnace combustion process in the two pieces of furnace reaktor, which are arrange parallel Gravley. The reaction occurs at a pressure of 9.914 atm at a temperature of 1200 to 1700 °C. Heavy oil as fuel 126,914.8115 tons/year go into the reactor at 160°C by heating steam which is using the heat from hot process gases. 1,563,084.6820 tons/year air for combustion are burn along with oil burning heavy fuel that produces heat to vaporize the heavy oil feed to the cracking temperature of 1650 °C. The vapor of cracking heavy oil will become carbon black and hydrogen gas and experience quenching with 249,502.3776 tons/year of water. Conversion occurs at 90%. Cracking process gases with carbon black separated via cyclones 2-4 series parallel. Carbon black powder with molasses, then mixed in the surge tank, and then formed into pellets in a pelletizer and dried by rotary dryer. The plant will be establish in Balongan, West Java in the area of 120000 m2 including area for expansion with 131 people labor needed. Factory work continuously for 24 hours a day for 330 days a year. Time to do the turn around is 35 days per year, including the time to start up and shut down. From the evaluation of economic, the results are Rp 471,975,782,980.45 + U.S. $ 69,248,894.23 of fixed capital, Rp 355,123,331,890.51 of working capital, Rp 1,123,811,825,682.89 of manufacturing cost, Rp 868,726,516,820.03 of general expenses. Profit before and after tax are Rp 510,136,657,497.08 / year and Rp 255,068,328,748.54 / year. Pre-tax and after taxes of ROI are 43.81% and 21.90%. POT before and after tax are 1.86 and 3.13 years, and then 47.57% of BEP, 29.79% of SDP, and 36.57% of DCFRR. From the economic evaluation, it can be conclude that the carbon black plant with a capacity of 100,000 tons/year is quite interesting to study further.
first_indexed 2024-03-13T23:18:42Z
format Thesis
id oai:generic.eprints.org:127883
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:18:42Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1278832016-03-04T08:40:57Z https://repository.ugm.ac.id/127883/ TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN , NANDA ANGGAKARA , Prof. Ir. Suryo Purwono, MA.Sc., Ph.D. ETD Carbon black plant of heavy oil is design with a capacity of 100,000 tons/year through the furnace combustion process in the two pieces of furnace reaktor, which are arrange parallel Gravley. The reaction occurs at a pressure of 9.914 atm at a temperature of 1200 to 1700 °C. Heavy oil as fuel 126,914.8115 tons/year go into the reactor at 160°C by heating steam which is using the heat from hot process gases. 1,563,084.6820 tons/year air for combustion are burn along with oil burning heavy fuel that produces heat to vaporize the heavy oil feed to the cracking temperature of 1650 °C. The vapor of cracking heavy oil will become carbon black and hydrogen gas and experience quenching with 249,502.3776 tons/year of water. Conversion occurs at 90%. Cracking process gases with carbon black separated via cyclones 2-4 series parallel. Carbon black powder with molasses, then mixed in the surge tank, and then formed into pellets in a pelletizer and dried by rotary dryer. The plant will be establish in Balongan, West Java in the area of 120000 m2 including area for expansion with 131 people labor needed. Factory work continuously for 24 hours a day for 330 days a year. Time to do the turn around is 35 days per year, including the time to start up and shut down. From the evaluation of economic, the results are Rp 471,975,782,980.45 + U.S. $ 69,248,894.23 of fixed capital, Rp 355,123,331,890.51 of working capital, Rp 1,123,811,825,682.89 of manufacturing cost, Rp 868,726,516,820.03 of general expenses. Profit before and after tax are Rp 510,136,657,497.08 / year and Rp 255,068,328,748.54 / year. Pre-tax and after taxes of ROI are 43.81% and 21.90%. POT before and after tax are 1.86 and 3.13 years, and then 47.57% of BEP, 29.79% of SDP, and 36.57% of DCFRR. From the economic evaluation, it can be conclude that the carbon black plant with a capacity of 100,000 tons/year is quite interesting to study further. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , NANDA ANGGAKARA and , Prof. Ir. Suryo Purwono, MA.Sc., Ph.D. (2013) TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=68192
spellingShingle ETD
, NANDA ANGGAKARA
, Prof. Ir. Suryo Purwono, MA.Sc., Ph.D.
TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title_full TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title_fullStr TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title_full_unstemmed TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title_short TUGAS PRARANCANGAN PABRIK UNIT CARBON BLACK DARI MINYAK BERAT KAPASITAS 100.000 TON/TAHUN
title_sort tugas prarancangan pabrik unit carbon black dari minyak berat kapasitas 100 000 ton tahun
topic ETD
work_keys_str_mv AT nandaanggakara tugasprarancanganpabrikunitcarbonblackdariminyakberatkapasitas100000tontahun
AT profirsuryopurwonomascphd tugasprarancanganpabrikunitcarbonblackdariminyakberatkapasitas100000tontahun