PENGEMBANGAN MODEL TINGKAT KEDEWASAAN MANAJEMEN PROYEK PERUSAHAAN TEKNOLOGI INFORMASI DI INDONESIA Nomor Soal: TKI 4011 / I-2013/2014 / BOED / 06 / 02 / 28.05 / 2013
Project based IT industries are differ in the way of developing project management maturity level. In traditional theory it is believed the level of project management maturity give a positive impact on the industry performance. But at the other side contingency theory says that higher level of proj...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
Summary: | Project based IT industries are differ in the way of developing project
management maturity level. In traditional theory it is believed the level of project
management maturity give a positive impact on the industry performance. But at
the other side contingency theory says that higher level of project management
maturity doesn�t make higher level of industry performance. The research has an
objective to test the traditional theory at the effect of the project management
maturity level to the IT industry performance.
The research is empirically proved by using instrument for survey. The
survey involve 30 respondent comes from different IT industries with different
scale of industry. The instrument been developed from several literature studies.
Before the survey is done, the instrument is reviewed by the expert. The
instrument is tested using data of the survey by exploratory factor analysis in
purpose of validity and reliability test. The data then used for further analysis
using linier regression to see the effect of project management maturity level to
the performance level of IT industry at Indonesia.
Results of the research provide an empirically tested instrument which is
valid and reliable. The data shows the IT industry are on the third level of project
management maturity which mean they have a standard on managing projects.
The further analysis shows that project management maturity level (X) give an
effect to industry performance level (Y) by model of y = 0.622x + 0.225. p-value
of the coefficient number of x is 0,06 which means project management maturity
level significantly affect industry performance. |
---|