KAJIAN TEKNIS DAN ANALISA HARGA SATUAN PEKERJAAN AKTUAL PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 40 METER Studi Kasus Proyek Peningkatan Jembatan Ironayan

Technical analysis and unit price project analysis are absolute things to be comprehended in a circle of construction projects. Price necessities that needed to do a kind of project item can be estimated by those two analysis. In Project of Improving Ironayan Bridge, project item of precast girder c...

Full description

Bibliographic Details
Main Authors: , YOGI HANINDITO, , Arief Setiawan Budi Nugroho, S.T., M.Eng., Ph.D.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
Description
Summary:Technical analysis and unit price project analysis are absolute things to be comprehended in a circle of construction projects. Price necessities that needed to do a kind of project item can be estimated by those two analysis. In Project of Improving Ironayan Bridge, project item of precast girder construction type I extend 40 m is sub-contracted by main contractor. The research is done to review technical analysis and unit price project analysis. From the review of those two analysis, it can be seen whether the value of unit price project of precast girder construction type I extend 40 m is lower or higher when it is done by private contractor. The observation during the project process is done to get primary data. The primary data contains implementation, the need for material components, tools, and labor. The value of quantity or coefficient of every component that used to produce one unit of project can be calculated with those primary data. The quantity value and the basic unit price of every component become the basic calculation of unit price project analysis. It is acquired that the value of unit price project as a result of research is lower than the contractor�s stipulation. The difference is about Rp 5.407.000,00 for every unit of precast girder that have to be constructed. This research explains the methods of implementation of precast girder construction type I extend 40 m specifically. Key note: Technical unit project analysis, unit price project analysis, precast girder construction type I extend 40 m.