STUDI EKSPERIMENTAL KINERJA BOILER MINI POWER PLANT P3TKEBTKE DEPT. ESDM RI
Boiler performance is determined by calculation of the efficiency that has been done, either by the direct method or the indirect method. The higher boiler efficiency the better its performance. This study was focused in analyzing performance of mini power plant boiler Center of Research and Develop...
Main Authors: | , YRVAN JOVA SEPTA DEVA, , Fauzun, S.T., M.T., Ph.D. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
Similar Items
-
STUDI EKSPERIMENTAL PROSES PEMBAKARAN PADA BOILER MINI POWER PLANT BERBAHAN BAKAR BIOMASSA
(Experimental Study Combustion Process of Biomass fueled Boiler in a Mini Power Plant)
Bekerjasama dengan Pusat Penelitian dan Pengembangan Teknologi Ketenagalistrikan, Energi Baru, Terbarukan dan Konservasi Energi (PPPTKEBTKE)
Badan Penelitian dan Pengembangan Energi dan Sumber Daya Mineral
by: , PUTRI NOVIASRI, et al.
Published: (2012) -
PERENCANAAN AUDIT KINERJA DENGAN PENDEKATAN RISK BASED INTERNAL AUDITING PADA INSPEKTORAT JENDERAL KEMENTERIAN ESDM
by: PRASASTI, DEA
Published: (2015) -
UUM signed agreement with Immigrant Dept
by: China, Press
Published: (2012) -
More Tamil studies depts at varsities
by: The, Star
Published: (2012) -
Studi Eksperimental Pengaruh Penggunaan Ejektor Dua Fase Terhadap Unjuk Kerja Siklus Refrigerasi Pada Mesin AC
by: Sunanto, Sunanto, et al.
Published: (2012)