METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA

Along with the increasing volume of vehicles to the location Tembalang Toll Plaza and inadequate Toll Plaza then Jasa Marga as the manager of highway which includes the toll booths Tembalang toll plaza renovation, remodeling toll gates, and the addition of a counter. In the implementation of the Pro...

Full description

Bibliographic Details
Main Authors: , ADI SUPRIANTO, , Agus Kurniawan, ST.,MT.,Ph.D
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1826048318321459200
author , ADI SUPRIANTO
, Agus Kurniawan, ST.,MT.,Ph.D
author_facet , ADI SUPRIANTO
, Agus Kurniawan, ST.,MT.,Ph.D
author_sort , ADI SUPRIANTO
collection UGM
description Along with the increasing volume of vehicles to the location Tembalang Toll Plaza and inadequate Toll Plaza then Jasa Marga as the manager of highway which includes the toll booths Tembalang toll plaza renovation, remodeling toll gates, and the addition of a counter. In the implementation of the Project Renovation and Plaza Toll Gate Tembalang, one of which was about the method where steel erection work on the steel erection work has a pretty interesting design is modeled as an open frame structure (Structure bearers order moments) and 3-dimensional truss. Where the structure consists of the framework composed of beams and columns and bracing steel I / WF supporting the wind load, billboards, workers live loads, lighting, ME, and the pile is modeled as a joint behave as anchor connected to the main structure, and implementation is carried out night so as not to disrupt the flow of traffic passing through the toll road.
first_indexed 2024-03-13T23:27:12Z
format Thesis
id oai:generic.eprints.org:129912
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:27:12Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1299122016-03-04T07:51:33Z https://repository.ugm.ac.id/129912/ METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA , ADI SUPRIANTO , Agus Kurniawan, ST.,MT.,Ph.D ETD Along with the increasing volume of vehicles to the location Tembalang Toll Plaza and inadequate Toll Plaza then Jasa Marga as the manager of highway which includes the toll booths Tembalang toll plaza renovation, remodeling toll gates, and the addition of a counter. In the implementation of the Project Renovation and Plaza Toll Gate Tembalang, one of which was about the method where steel erection work on the steel erection work has a pretty interesting design is modeled as an open frame structure (Structure bearers order moments) and 3-dimensional truss. Where the structure consists of the framework composed of beams and columns and bracing steel I / WF supporting the wind load, billboards, workers live loads, lighting, ME, and the pile is modeled as a joint behave as anchor connected to the main structure, and implementation is carried out night so as not to disrupt the flow of traffic passing through the toll road. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ADI SUPRIANTO and , Agus Kurniawan, ST.,MT.,Ph.D (2014) METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=70321
spellingShingle ETD
, ADI SUPRIANTO
, Agus Kurniawan, ST.,MT.,Ph.D
METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title_full METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title_fullStr METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title_full_unstemmed METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title_short METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA TOL TEMBALANG � SEMARANG PT. JASA MARGA
title_sort metode pelaksanaan erection baja menggunakan mobile crane proyek renovasi gerbang dan plasa tol tembalang a�� semarang pt jasa marga
topic ETD
work_keys_str_mv AT adisuprianto metodepelaksanaanerectionbajamenggunakanmobilecraneproyekrenovasigerbangdanplasatoltembalangasemarangptjasamarga
AT aguskurniawanstmtphd metodepelaksanaanerectionbajamenggunakanmobilecraneproyekrenovasigerbangdanplasatoltembalangasemarangptjasamarga