PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU
PT Rumpun Sari Kemuning I is engaged in the industry in the processing of semi-finished dry tea. Tea leaf plucked the garden then processedand shipped to domestic consumers and export. This company is located in the Kemuning village, Karanganyar, Central Java. In this packaging station�s it still...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
_version_ | 1826048364340314112 |
---|---|
author | , KARINA RAMADHANI , Dr. Kuncoro Harto Widodo, STP, M.Eng. |
author_facet | , KARINA RAMADHANI , Dr. Kuncoro Harto Widodo, STP, M.Eng. |
author_sort | , KARINA RAMADHANI |
collection | UGM |
description | PT Rumpun Sari Kemuning I is engaged in the industry in the processing of semi-finished dry tea. Tea leaf plucked the garden then processedand shipped to domestic consumers and export. This company is located in the Kemuning village, Karanganyar, Central Java. In this packaging station�s it still uses manual system that is working with the help of labor so that workers don�t yet have a standard time for work. Therefore, measurements the standard time�s labor and known amount of theoretically labor.
Determination the amount of theoretical labor�s Rumpun Sari Kemuning I Company aims to improve the effectiveness and efficiency. Method used is the time study to make observations on the time workers 30 times. After that, the normal time can be determined by first determining the rating factor and then the standard time can be determined by first determining allowance factor.
By knowing the cycle time, normal time, and standard time so can be determined the amount of theoretically labor. The amount of labor required for each work operation on packaging station�s PT Rumpun Sari Kemuning as many one person. |
first_indexed | 2024-03-13T23:27:55Z |
format | Thesis |
id | oai:generic.eprints.org:130145 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T23:27:55Z |
publishDate | 2014 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1301452016-03-04T07:57:53Z https://repository.ugm.ac.id/130145/ PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU , KARINA RAMADHANI , Dr. Kuncoro Harto Widodo, STP, M.Eng. ETD PT Rumpun Sari Kemuning I is engaged in the industry in the processing of semi-finished dry tea. Tea leaf plucked the garden then processedand shipped to domestic consumers and export. This company is located in the Kemuning village, Karanganyar, Central Java. In this packaging station�s it still uses manual system that is working with the help of labor so that workers don�t yet have a standard time for work. Therefore, measurements the standard time�s labor and known amount of theoretically labor. Determination the amount of theoretical labor�s Rumpun Sari Kemuning I Company aims to improve the effectiveness and efficiency. Method used is the time study to make observations on the time workers 30 times. After that, the normal time can be determined by first determining the rating factor and then the standard time can be determined by first determining allowance factor. By knowing the cycle time, normal time, and standard time so can be determined the amount of theoretically labor. The amount of labor required for each work operation on packaging station�s PT Rumpun Sari Kemuning as many one person. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , KARINA RAMADHANI and , Dr. Kuncoro Harto Widodo, STP, M.Eng. (2014) PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=70560 |
spellingShingle | ETD , KARINA RAMADHANI , Dr. Kuncoro Harto Widodo, STP, M.Eng. PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title | PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I
KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title_full | PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I
KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title_fullStr | PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I
KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title_full_unstemmed | PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I
KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title_short | PENENTUAN JUMLAH TENAGA KERJA TEORITIS DI STASIUN PENGEMASAN PT. RUMPUN SARI KEMUNING I
KARANGANYAR MENGGUNAKAN METODE STUDI WAKTU |
title_sort | penentuan jumlah tenaga kerja teoritis di stasiun pengemasan pt rumpun sari kemuning i karanganyar menggunakan metode studi waktu |
topic | ETD |
work_keys_str_mv | AT karinaramadhani penentuanjumlahtenagakerjateoritisdistasiunpengemasanptrumpunsarikemuningikaranganyarmenggunakanmetodestudiwaktu AT drkuncorohartowidodostpmeng penentuanjumlahtenagakerjateoritisdistasiunpengemasanptrumpunsarikemuningikaranganyarmenggunakanmetodestudiwaktu |