EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG

Medari substation has two transformers, with each capacity of 30 MVA. Transformers III connected with MDI-7 feeder that supplies the area of Sleman and Wates. In 2011, feeder MDI-7 serve the load in the Wates area after take it from feeder WT-5. This load is in Kalibawang and Samigaluh region, which...

Full description

Bibliographic Details
Main Authors: , SATRIO AGUNG NUGROHO, , Ir. M. Isnaeni, B.S., M.T
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035422999642112
author , SATRIO AGUNG NUGROHO
, Ir. M. Isnaeni, B.S., M.T
author_facet , SATRIO AGUNG NUGROHO
, Ir. M. Isnaeni, B.S., M.T
author_sort , SATRIO AGUNG NUGROHO
collection UGM
description Medari substation has two transformers, with each capacity of 30 MVA. Transformers III connected with MDI-7 feeder that supplies the area of Sleman and Wates. In 2011, feeder MDI-7 serve the load in the Wates area after take it from feeder WT-5. This load is in Kalibawang and Samigaluh region, which is located at the end of the feeder WT-5. As a result of this load, the voltage drop in the feeder WT-5 is very large because the load lies very far from the substation, with a network length of about 44 km. In 2008, a simulation of medium voltage networks of WT-5 found the voltage drop at the farthest end of 10.01 %. Therefore, to reduce the voltage drop existing in the load area of Samigaluh and Kalibawang moved to a closer substation, the Medari substation. Now that feeder MDI � 7 has been operating, it may be necessary to evaluate the performance of feeder MDI - 7 in terms of power loss and voltage drop due to the removal of the load. The analysis will be done by load flow analysis. From the results of the analysis will be seen how much power flow on feeder MDI-7 after receiving the transfer of load from the feeder WT-5 to see the power loss and drop voltage at the feeders. The reliability index value of SAIFI, SAIDI, and CAIDI will also be calculated. From the result it can be seen that when feeder MDI-7 supplies the load in Samigaluh and Kalibawang area, the voltage drop is less than when the load is supplied by WT-5.
first_indexed 2024-03-13T23:29:59Z
format Thesis
id oai:generic.eprints.org:130647
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:29:59Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1306472016-03-04T08:12:03Z https://repository.ugm.ac.id/130647/ EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG , SATRIO AGUNG NUGROHO , Ir. M. Isnaeni, B.S., M.T ETD Medari substation has two transformers, with each capacity of 30 MVA. Transformers III connected with MDI-7 feeder that supplies the area of Sleman and Wates. In 2011, feeder MDI-7 serve the load in the Wates area after take it from feeder WT-5. This load is in Kalibawang and Samigaluh region, which is located at the end of the feeder WT-5. As a result of this load, the voltage drop in the feeder WT-5 is very large because the load lies very far from the substation, with a network length of about 44 km. In 2008, a simulation of medium voltage networks of WT-5 found the voltage drop at the farthest end of 10.01 %. Therefore, to reduce the voltage drop existing in the load area of Samigaluh and Kalibawang moved to a closer substation, the Medari substation. Now that feeder MDI � 7 has been operating, it may be necessary to evaluate the performance of feeder MDI - 7 in terms of power loss and voltage drop due to the removal of the load. The analysis will be done by load flow analysis. From the results of the analysis will be seen how much power flow on feeder MDI-7 after receiving the transfer of load from the feeder WT-5 to see the power loss and drop voltage at the feeders. The reliability index value of SAIFI, SAIDI, and CAIDI will also be calculated. From the result it can be seen that when feeder MDI-7 supplies the load in Samigaluh and Kalibawang area, the voltage drop is less than when the load is supplied by WT-5. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , SATRIO AGUNG NUGROHO and , Ir. M. Isnaeni, B.S., M.T (2014) EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=71073
spellingShingle ETD
, SATRIO AGUNG NUGROHO
, Ir. M. Isnaeni, B.S., M.T
EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title_full EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title_fullStr EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title_full_unstemmed EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title_short EVALUASI KINERJA PENYULANG MEDARI 7 SETELAH PEMINDAHAN WILAYAH BEBAN DI SAMIGALUH DAN KALIBAWANG
title_sort evaluasi kinerja penyulang medari 7 setelah pemindahan wilayah beban di samigaluh dan kalibawang
topic ETD
work_keys_str_mv AT satrioagungnugroho evaluasikinerjapenyulangmedari7setelahpemindahanwilayahbebandisamigaluhdankalibawang
AT irmisnaenibsmt evaluasikinerjapenyulangmedari7setelahpemindahanwilayahbebandisamigaluhdankalibawang