NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)

This study aimed to calculate the estimated annual maintenance costs over the life of the building and identify the level of importance and performance success factors of building maintenance. The role of asset management in particular in building maintenance is essenti...

Full description

Bibliographic Details
Main Authors: , ETIK WINARNI, , Prof. Lincolin Arsyad, Ph.D.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035517624188928
author , ETIK WINARNI
, Prof. Lincolin Arsyad, Ph.D.
author_facet , ETIK WINARNI
, Prof. Lincolin Arsyad, Ph.D.
author_sort , ETIK WINARNI
collection UGM
description This study aimed to calculate the estimated annual maintenance costs over the life of the building and identify the level of importance and performance success factors of building maintenance. The role of asset management in particular in building maintenance is essential to preserve the value of physical assets including stock of building, maintaining buildings worthy condition function and keep the condition of buildings reaching statutory and regulatory requirements so it takes planning and efficient cost control that goes with optimal maintenance purposes. This study used purposive sampling with the number of respondents 50 respondents. Linear trend model is used to calculate the estimated annual maintenance costs and the importance of building performance analysis (IPA) is used to identify the level of importance and performance success factors of building maintenance. The results of the study with Linear Trend Model known standard annual maintenance cost per-m2 building for 10 years ie from 2014 to 2023. Estimated cost of building maintenance PPIKSN 2014 amounted Rp930.493.440 and increased cost-per-m2 2 percent and the increased cost of Rp46.063.360. Importance of research results with a Performance Analysis shows that there are six factors of success of building maintenance that still needs to be improved performance. These factors are the existence of an emergency maintenance program / unplanned maintenance work history records building, identification of the cause of damage to buildings, in buildings where maintenance personnel program exclusively for hygiene (for rooms), Description of work / maintenance job descriptions, measurements performance in building maintenance terdefenisis well, and Implementation of transparency-related costs in building maintenance
first_indexed 2024-03-13T23:32:04Z
format Thesis
id oai:generic.eprints.org:131122
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:32:04Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1311222016-03-04T07:55:40Z https://repository.ugm.ac.id/131122/ NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR) , ETIK WINARNI , Prof. Lincolin Arsyad, Ph.D. ETD This study aimed to calculate the estimated annual maintenance costs over the life of the building and identify the level of importance and performance success factors of building maintenance. The role of asset management in particular in building maintenance is essential to preserve the value of physical assets including stock of building, maintaining buildings worthy condition function and keep the condition of buildings reaching statutory and regulatory requirements so it takes planning and efficient cost control that goes with optimal maintenance purposes. This study used purposive sampling with the number of respondents 50 respondents. Linear trend model is used to calculate the estimated annual maintenance costs and the importance of building performance analysis (IPA) is used to identify the level of importance and performance success factors of building maintenance. The results of the study with Linear Trend Model known standard annual maintenance cost per-m2 building for 10 years ie from 2014 to 2023. Estimated cost of building maintenance PPIKSN 2014 amounted Rp930.493.440 and increased cost-per-m2 2 percent and the increased cost of Rp46.063.360. Importance of research results with a Performance Analysis shows that there are six factors of success of building maintenance that still needs to be improved performance. These factors are the existence of an emergency maintenance program / unplanned maintenance work history records building, identification of the cause of damage to buildings, in buildings where maintenance personnel program exclusively for hygiene (for rooms), Description of work / maintenance job descriptions, measurements performance in building maintenance terdefenisis well, and Implementation of transparency-related costs in building maintenance [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ETIK WINARNI and , Prof. Lincolin Arsyad, Ph.D. (2014) NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=71569
spellingShingle ETD
, ETIK WINARNI
, Prof. Lincolin Arsyad, Ph.D.
NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title_full NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title_fullStr NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title_full_unstemmed NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title_short NALISIS BIAYA DAN PEMELIHARAAN BANGUNAN GEDUNG KAWASAN NUKLIRSERPONG TAHUN 2014 (STUDI GEDUNG PUSAT PENDAYAGUNAAN INFORMATIKA STRATEGI NUKLIR)
title_sort nalisis biaya dan pemeliharaan bangunan gedung kawasan nuklirserpong tahun 2014 studi gedung pusat pendayagunaan informatika strategi nuklir
topic ETD
work_keys_str_mv AT etikwinarni nalisisbiayadanpemeliharaanbangunangedungkawasannuklirserpongtahun2014studigedungpusatpendayagunaaninformatikastrateginuklir
AT proflincolinarsyadphd nalisisbiayadanpemeliharaanbangunangedungkawasannuklirserpongtahun2014studigedungpusatpendayagunaaninformatikastrateginuklir