PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials tha...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
_version_ | 1797035677477502976 |
---|---|
author | , MEGHAN OCHTIANTY AAS , Dr. Eng. Iman Haryanto, MT. |
author_facet | , MEGHAN OCHTIANTY AAS , Dr. Eng. Iman Haryanto, MT. |
author_sort | , MEGHAN OCHTIANTY AAS |
collection | UGM |
description | Quest Hotel Solo is category of high rise building, it is height
approximately 76.650 m or more of the requirements of high rise building that is
24 m, the number of floors with 22 floors and is equipped with a ballroom and
swimming pool facilities. Implementation of this project using materials that
have been fabrication strategies, such as use of materials wiremesh and
formwork lico, the point that the job quickly resolved, especially the work
structure, and also to make it more efficient.
Use of Microsoft Project for managing time here than any existing work,
especially the work structure, that is able to complete projects on time and meet
the planned target. Due to the delay in coming materials, and inadequate power,
make a schedule and work structure setbacks. At the monthly progress, the
target job must be completed by 41.823% and the realization of the field is
37.666%. Delay seen in the structure of work in the field, this job was supposed
to date the structure has reached the 11th floor, while the structure of the work is
still on the floor 9.
Some ways are also made to overcome delays, one of which is to
increase the working hours or increase working time (overtime). Less qualified
workers is replaced with other workforce training or experience in doing the job
structure. |
first_indexed | 2024-03-13T23:34:30Z |
format | Thesis |
id | oai:generic.eprints.org:131889 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T23:34:30Z |
publishDate | 2014 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1318892016-03-04T07:59:33Z https://repository.ugm.ac.id/131889/ PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT , MEGHAN OCHTIANTY AAS , Dr. Eng. Iman Haryanto, MT. ETD Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials that have been fabrication strategies, such as use of materials wiremesh and formwork lico, the point that the job quickly resolved, especially the work structure, and also to make it more efficient. Use of Microsoft Project for managing time here than any existing work, especially the work structure, that is able to complete projects on time and meet the planned target. Due to the delay in coming materials, and inadequate power, make a schedule and work structure setbacks. At the monthly progress, the target job must be completed by 41.823% and the realization of the field is 37.666%. Delay seen in the structure of work in the field, this job was supposed to date the structure has reached the 11th floor, while the structure of the work is still on the floor 9. Some ways are also made to overcome delays, one of which is to increase the working hours or increase working time (overtime). Less qualified workers is replaced with other workforce training or experience in doing the job structure. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , MEGHAN OCHTIANTY AAS and , Dr. Eng. Iman Haryanto, MT. (2014) PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72399 |
spellingShingle | ETD , MEGHAN OCHTIANTY AAS , Dr. Eng. Iman Haryanto, MT. PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title | PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title_full | PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title_fullStr | PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title_full_unstemmed | PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title_short | PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO
DENGAN MENGGUNAKAN MICROSOFT PROJECT |
title_sort | pengelolaan waktu pada pekerjaan struktur dalam proyek pembangunan quest hotel solo dengan menggunakan microsoft project |
topic | ETD |
work_keys_str_mv | AT meghanochtiantyaas pengelolaanwaktupadapekerjaanstrukturdalamproyekpembangunanquesthotelsolodenganmenggunakanmicrosoftproject AT drengimanharyantomt pengelolaanwaktupadapekerjaanstrukturdalamproyekpembangunanquesthotelsolodenganmenggunakanmicrosoftproject |