PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT

Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials tha...

Full description

Bibliographic Details
Main Authors: , MEGHAN OCHTIANTY AAS, , Dr. Eng. Iman Haryanto, MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035677477502976
author , MEGHAN OCHTIANTY AAS
, Dr. Eng. Iman Haryanto, MT.
author_facet , MEGHAN OCHTIANTY AAS
, Dr. Eng. Iman Haryanto, MT.
author_sort , MEGHAN OCHTIANTY AAS
collection UGM
description Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials that have been fabrication strategies, such as use of materials wiremesh and formwork lico, the point that the job quickly resolved, especially the work structure, and also to make it more efficient. Use of Microsoft Project for managing time here than any existing work, especially the work structure, that is able to complete projects on time and meet the planned target. Due to the delay in coming materials, and inadequate power, make a schedule and work structure setbacks. At the monthly progress, the target job must be completed by 41.823% and the realization of the field is 37.666%. Delay seen in the structure of work in the field, this job was supposed to date the structure has reached the 11th floor, while the structure of the work is still on the floor 9. Some ways are also made to overcome delays, one of which is to increase the working hours or increase working time (overtime). Less qualified workers is replaced with other workforce training or experience in doing the job structure.
first_indexed 2024-03-13T23:34:30Z
format Thesis
id oai:generic.eprints.org:131889
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:34:30Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1318892016-03-04T07:59:33Z https://repository.ugm.ac.id/131889/ PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT , MEGHAN OCHTIANTY AAS , Dr. Eng. Iman Haryanto, MT. ETD Quest Hotel Solo is category of high rise building, it is height approximately 76.650 m or more of the requirements of high rise building that is 24 m, the number of floors with 22 floors and is equipped with a ballroom and swimming pool facilities. Implementation of this project using materials that have been fabrication strategies, such as use of materials wiremesh and formwork lico, the point that the job quickly resolved, especially the work structure, and also to make it more efficient. Use of Microsoft Project for managing time here than any existing work, especially the work structure, that is able to complete projects on time and meet the planned target. Due to the delay in coming materials, and inadequate power, make a schedule and work structure setbacks. At the monthly progress, the target job must be completed by 41.823% and the realization of the field is 37.666%. Delay seen in the structure of work in the field, this job was supposed to date the structure has reached the 11th floor, while the structure of the work is still on the floor 9. Some ways are also made to overcome delays, one of which is to increase the working hours or increase working time (overtime). Less qualified workers is replaced with other workforce training or experience in doing the job structure. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , MEGHAN OCHTIANTY AAS and , Dr. Eng. Iman Haryanto, MT. (2014) PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72399
spellingShingle ETD
, MEGHAN OCHTIANTY AAS
, Dr. Eng. Iman Haryanto, MT.
PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title_full PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title_fullStr PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title_full_unstemmed PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title_short PENGELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN MENGGUNAKAN MICROSOFT PROJECT
title_sort pengelolaan waktu pada pekerjaan struktur dalam proyek pembangunan quest hotel solo dengan menggunakan microsoft project
topic ETD
work_keys_str_mv AT meghanochtiantyaas pengelolaanwaktupadapekerjaanstrukturdalamproyekpembangunanquesthotelsolodenganmenggunakanmicrosoftproject
AT drengimanharyantomt pengelolaanwaktupadapekerjaanstrukturdalamproyekpembangunanquesthotelsolodenganmenggunakanmicrosoftproject