SETTING KOORDINASI RECLOSER RBY DAN SECTIONALIZER JLG FEEDER CIMARAGAS SUTM 20 KV DI PT. PLN (PERSERO) AREA TASIKMALAYA
In distribution networks often are impaired resulting in decreased continuity of electrical power is distributed to the customer . Thus the required high food distribution system reliability . Distribution system reliability could not be separated from the equipment that is used as a safety protecti...
Main Authors: | , REZA ADISETIA S, , Ir. Daroto. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
Similar Items
-
Analisis statistik tahanan pentanahan titik netral bersama SUTM 20 kV 3-FASA 4-KAWAT PT. PLN (Persero) APJ Salatiga
by: , DADI, et al.
Published: (2010) -
SISTEM KOORDINASI PROTEKSI PEMUTUS TENAGA (PMT) DENGAN PENUTUP BALIK OTOMATIS (PBO) PENYULANG BANTUL 6 DI PT. PLN (PERSERO) RAYON BANTUL
by: , ARIEF HIDAYAT, et al.
Published: (2013) -
ANTENA LARIK MICROSTRIP UNTUK SISTEM SCADA PADA OPERASI RECLOSER PT PLN (PERSERO) AREA PENGATUR DISTRIBUSI
JAWA TENGAH DAN YOGYAKARTA
by: , Budi Basuki Subagio, et al.
Published: (2012) -
REKONFIGURASI
JARINGAN TEGANGAN MENENGAH 20 KV
PT. PLN (PERSERO) LHOKSEUMAWE UNTUK
MEMINIMALKAN RUGI DAYA
by: , Badriana, S.T., et al.
Published: (2012) -
αRby—An Embedding of Alloy in Ruby
by: Milicevic, Aleksandar, et al.
Published: (2015)