Summary: | Highway (in Indonesia also called as a free way) is a alternative road to
solved a traffic jam or for the cut the distance to other place. A highway is a part of
national road system and for using highway, a user must be paid based on cost. PT.
Jasa Marga (Persero) Tbk. to maintenance Palimanan-Kanci Highway, such
maintenance periodic project.
This maintenance project to give back highway perform form a bad perform
to excellent perform to be upgrading quality service for the suit operational
standard. Maintenance process periodic to be upgrading highway structure such as,
Scrapping, Filling and Overlay (SFO). Scrapping operation to be get peeled off slick
flexible pavement existing., Scrapping Operation to use Cold Milling, and Dump
Truck. Filling Operation to be fill slick flexible pavement and Overlay Operation to
be fill slick surface corse flexible pavement. Filling and Overlay operation to use
Asphalt Finisher, Dump Truck, Tandem Roller, and Pneumatic Tyred Roller.
Based on observation could concluded, there are several noticed wich on
implementation. There were need coordination between related person about project,
extra controlling project, more applying SMK3 rules and controlling routine to
smoothnes project and minimalized overdue project.
|