PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS

Tempe Murni Muchlar Industry is a home-based industry since 1985 and now engaged in the business of the making of tempe with traditional processing in the area of Kasihan, Bantul, Yogyakarta. The business owned by Mr. H. Muchlar and he has 10 employees, where the workers are doing activities of raw...

Full description

Bibliographic Details
Main Authors: , AGRA ZULFANUDDIN, , Ir. Guntarti Tatik Mulyati, MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035707460485120
author , AGRA ZULFANUDDIN
, Ir. Guntarti Tatik Mulyati, MT.
author_facet , AGRA ZULFANUDDIN
, Ir. Guntarti Tatik Mulyati, MT.
author_sort , AGRA ZULFANUDDIN
collection UGM
description Tempe Murni Muchlar Industry is a home-based industry since 1985 and now engaged in the business of the making of tempe with traditional processing in the area of Kasihan, Bantul, Yogyakarta. The business owned by Mr. H. Muchlar and he has 10 employees, where the workers are doing activities of raw material sieving, washing, soaking, boiling, grinding, separation of the peel, cooling, fermentation, and packaging. The activities are done manually and it takes a long time, even the workers have to work in a standing posture which is can cause fatigue. The aim of the research is to determine the resting time also to determine the duration of resting time. Physiological criteria that being are observed heart rate, body temperature, and the level of sleepiness. Movement of the heart rate workers are observed, then the energy expenditure and duration of rest periods are calculated. Measurement of body temperature rhythm is observed in order to determine the body as well as to determine the break time. The level of sleepiness workers while working be obtained with Stanford Sleepiness Scale method. The result of research shows that based on physiological criteria, workers get off-time from working at 5 or exactly at 11:00 with the duration of rest periods on average 17 minutes. Keywords: heart rate, level of sleepiness , body temperature, time off
first_indexed 2024-03-13T23:34:57Z
format Thesis
id oai:generic.eprints.org:132038
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:34:57Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1320382016-03-04T07:51:45Z https://repository.ugm.ac.id/132038/ PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS , AGRA ZULFANUDDIN , Ir. Guntarti Tatik Mulyati, MT. ETD Tempe Murni Muchlar Industry is a home-based industry since 1985 and now engaged in the business of the making of tempe with traditional processing in the area of Kasihan, Bantul, Yogyakarta. The business owned by Mr. H. Muchlar and he has 10 employees, where the workers are doing activities of raw material sieving, washing, soaking, boiling, grinding, separation of the peel, cooling, fermentation, and packaging. The activities are done manually and it takes a long time, even the workers have to work in a standing posture which is can cause fatigue. The aim of the research is to determine the resting time also to determine the duration of resting time. Physiological criteria that being are observed heart rate, body temperature, and the level of sleepiness. Movement of the heart rate workers are observed, then the energy expenditure and duration of rest periods are calculated. Measurement of body temperature rhythm is observed in order to determine the body as well as to determine the break time. The level of sleepiness workers while working be obtained with Stanford Sleepiness Scale method. The result of research shows that based on physiological criteria, workers get off-time from working at 5 or exactly at 11:00 with the duration of rest periods on average 17 minutes. Keywords: heart rate, level of sleepiness , body temperature, time off [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , AGRA ZULFANUDDIN and , Ir. Guntarti Tatik Mulyati, MT. (2014) PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72554
spellingShingle ETD
, AGRA ZULFANUDDIN
, Ir. Guntarti Tatik Mulyati, MT.
PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title_full PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title_fullStr PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title_full_unstemmed PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title_short PENENTUAN WAKTU ISTIRAHAT PEKERJA PEMBUATAN TEMPE �MUCHLAR� BERDASARKAN KRITERIA FISIOLOGIS
title_sort penentuan waktu istirahat pekerja pembuatan tempe a��muchlara�� berdasarkan kriteria fisiologis
topic ETD
work_keys_str_mv AT agrazulfanuddin penentuanwaktuistirahatpekerjapembuatantempeamuchlaraberdasarkankriteriafisiologis
AT irguntartitatikmulyatimt penentuanwaktuistirahatpekerjapembuatantempeamuchlaraberdasarkankriteriafisiologis