DETAIL ENGINEERING DRAWING PEMBUATAN CONVEYOR PADA TOSO TRAINING ROOM 6*0A PROJECT DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA KARAWANG � JAWA BARAT
The quality of each unit produced by Toyota is a priority that makes Toyota became the primary car choice of Indonesian society. To maintain the quality of each unit that produced by Toyota, need a perfect end result and have high competitiveness. One of the external factors which attract the consum...
Główni autorzy: | , ASTRI RATNA SARI, , Hidayat Nur Isnianto, S.T., M.Eng. |
---|---|
Format: | Praca dyplomowa |
Wydane: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Hasła przedmiotowe: |
Podobne zapisy
-
PEMBUATAN TRAINER SISTEM PENGAPIAN TOYOTA KIJANG 5K
od: , AZIZ ISKANDAR, i wsp.
Wydane: (2013) -
Plotting & drawing II : topographical detail [slaid]
Wydane: (1981) -
Kualitas pelayanan pertanahan pada Kantor Pertanahan Kabupaten Karawang, Propinsi Jawa Barat
od: , DACHRI, H. Effendi A, i wsp.
Wydane: (2007) -
ANALISIS KEGAGALAN ISOLASI MINYAK TRANSFORMATOR 20 kV Di PT. PLN (Persero) Distribusi Jawa Barat dan Banten Area Pelayanan dan Jaringan (APJ) Karawang KARAWANG � JAWA BARAT
od: , FAHMI REZA, i wsp.
Wydane: (2014) -
Model conveyor : isometrik /
od: 281051 Rudd, Johnson