METODE PELAKSANAAN PEKERJAAN CORE WALL PT. PEMBANGUNAN PROYEK APARTEMEN SKYLAND CITY ROSE IN SPRING JATINANGOR PP (PERSERO) Tbk. - CABANG IV
In the process, there are so many methods to maintain the stability of high rise buildings especially in resisting the lateral loads that have sigfinicant effects on it. Several systems are introduced to maintain the stability og high rise building including a shear wall structure and core wall. The...
Main Authors: | , DONY AZHARI, , Devi Oktaviana Latif, ST, M.Eng. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
Similar Items
-
ANALISIS DAN PERENCANAAN TANGGA PROYEK SKYLAND CITY � JATINANGOR, SUMEDANG
by: , ILYAS ZAINUL BAHAR, et al.
Published: (2014) -
PELAKSANAAN STRUKTUR PADA PROYEK APARTEMENT SKYLAND CITY JATINANGOR DENGAN METODE
KONVENSIONAL DI PT. PP (Persero)Tbk.
by: , RODDY M BARINGBING, et al.
Published: (2014) -
PEMBUATAN SCHEDULE PEKERJAAN BASEMENT 2
PROYEK PEMBANGUNAN APARTEMEN GRAND DHIKA CITY
PT. ADHI KARYA (Persero), Tbk DIVISI KONSTRUKSI I
by: , MUHAMMAD ROIS MUSTAK FAOZI, et al.
Published: (2013) -
APARTEMEN DI YOGYAKARTA PENEKANAN PADA PRIVASI PENGHUNI APARTEMEN
by: , RIO BRAMANTYO SETIAWAN, et al.
Published: (2013) -
ANALISIS DAN EVALUASI KAPASITAS DAYA DUKUNG
FONDASI BOR PADA PROYEK APARTEMEN MALIOBORO
CITY YOGYAKARTA
by: , ARGHA, et al.
Published: (2014)