PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE

Analysis of Tower Crane productivity is very important to determine the ability of Tower Crane to produce something. Tower Crane is an important factor in the construction projects rise buildings with large scale implementation of the project and construction is expected to be achieved more easily i...

Full description

Bibliographic Details
Main Authors: , ZULFI NIHAYATUN N, , Dr. Eng. Iman Haryanto, ST.,MT.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035849324429312
author , ZULFI NIHAYATUN N
, Dr. Eng. Iman Haryanto, ST.,MT.
author_facet , ZULFI NIHAYATUN N
, Dr. Eng. Iman Haryanto, ST.,MT.
author_sort , ZULFI NIHAYATUN N
collection UGM
description Analysis of Tower Crane productivity is very important to determine the ability of Tower Crane to produce something. Tower Crane is an important factor in the construction projects rise buildings with large scale implementation of the project and construction is expected to be achieved more easily in a relatively short time . As for some of the factors that affect the productivity of Tower Crane, among others, the condition of the tool, field conditions, management factors, the ability of the operator. In the use of Tower Crane difficult finding a tool that is 100% condition. Always there is a decrease in productivity tools Tower Crane, and the resulting increase in the duration of the work that resulted in the execution work effectiveness in the implementation of the multi-storey building construction work. Thus, it can be concluded that productivity is the ability to produce something, which can affect the time and work effectiveness in the execution of the work. Results productivity of 6.67 tonnes / hour and the estimated time of the appointment of 0.576 hours.
first_indexed 2024-03-13T23:37:00Z
format Thesis
id oai:generic.eprints.org:132700
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:37:00Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1327002016-03-04T08:19:20Z https://repository.ugm.ac.id/132700/ PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE , ZULFI NIHAYATUN N , Dr. Eng. Iman Haryanto, ST.,MT. ETD Analysis of Tower Crane productivity is very important to determine the ability of Tower Crane to produce something. Tower Crane is an important factor in the construction projects rise buildings with large scale implementation of the project and construction is expected to be achieved more easily in a relatively short time . As for some of the factors that affect the productivity of Tower Crane, among others, the condition of the tool, field conditions, management factors, the ability of the operator. In the use of Tower Crane difficult finding a tool that is 100% condition. Always there is a decrease in productivity tools Tower Crane, and the resulting increase in the duration of the work that resulted in the execution work effectiveness in the implementation of the multi-storey building construction work. Thus, it can be concluded that productivity is the ability to produce something, which can affect the time and work effectiveness in the execution of the work. Results productivity of 6.67 tonnes / hour and the estimated time of the appointment of 0.576 hours. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ZULFI NIHAYATUN N and , Dr. Eng. Iman Haryanto, ST.,MT. (2014) PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73241
spellingShingle ETD
, ZULFI NIHAYATUN N
, Dr. Eng. Iman Haryanto, ST.,MT.
PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title_full PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title_fullStr PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title_full_unstemmed PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title_short PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
title_sort perhitungan produktivitas dan estimasi waktu pengecoran kolom menggunakan tower crane
topic ETD
work_keys_str_mv AT zulfinihayatunn perhitunganproduktivitasdanestimasiwaktupengecorankolommenggunakantowercrane
AT drengimanharyantostmt perhitunganproduktivitasdanestimasiwaktupengecorankolommenggunakantowercrane