METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).

Column is a vertical compression member that serves to support the load of the roof. The installment of reinforcing steel bar is done paralel with steel of pilecap. At the beginning of the Pasar Legi Parakan project construction, the zero point floor elevation was not yet known, so the height of the...

Full description

Bibliographic Details
Main Authors: , ARIEF WIRAGUNA, , Agus Kurniawan, ST.,MT.,Ph.D.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2014
Subjects:
ETD
_version_ 1797035913514057728
author , ARIEF WIRAGUNA
, Agus Kurniawan, ST.,MT.,Ph.D.
author_facet , ARIEF WIRAGUNA
, Agus Kurniawan, ST.,MT.,Ph.D.
author_sort , ARIEF WIRAGUNA
collection UGM
description Column is a vertical compression member that serves to support the load of the roof. The installment of reinforcing steel bar is done paralel with steel of pilecap. At the beginning of the Pasar Legi Parakan project construction, the zero point floor elevation was not yet known, so the height of the column reinforcement could not been determined. The method of overstek reinforcement was used to speed up pilecap casting, while a review design has been done. The methods of overstek reinforcement done by installing reinforcement along one meter plus high of pilecap, whereas for continuous reinforcement normally fitted with the appropriate distance between the floor height. While,if there are paralel work are in same time, then the overstek reinforcement method can be used as an alternative to speed up the completion of the construction below it. From the calculation it is known that continuous reinforcement is more efficient in terms of cost and time, the aspect of cuttings reinforcement, as reinforcement could be balance any overstek in field, so that construction could continue running.
first_indexed 2024-03-13T23:37:56Z
format Thesis
id oai:generic.eprints.org:132996
institution Universiti Gadjah Mada
last_indexed 2024-03-13T23:37:56Z
publishDate 2014
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1329962016-03-04T07:52:32Z https://repository.ugm.ac.id/132996/ METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero). , ARIEF WIRAGUNA , Agus Kurniawan, ST.,MT.,Ph.D. ETD Column is a vertical compression member that serves to support the load of the roof. The installment of reinforcing steel bar is done paralel with steel of pilecap. At the beginning of the Pasar Legi Parakan project construction, the zero point floor elevation was not yet known, so the height of the column reinforcement could not been determined. The method of overstek reinforcement was used to speed up pilecap casting, while a review design has been done. The methods of overstek reinforcement done by installing reinforcement along one meter plus high of pilecap, whereas for continuous reinforcement normally fitted with the appropriate distance between the floor height. While,if there are paralel work are in same time, then the overstek reinforcement method can be used as an alternative to speed up the completion of the construction below it. From the calculation it is known that continuous reinforcement is more efficient in terms of cost and time, the aspect of cuttings reinforcement, as reinforcement could be balance any overstek in field, so that construction could continue running. [Yogyakarta] : Universitas Gadjah Mada 2014 Thesis NonPeerReviewed , ARIEF WIRAGUNA and , Agus Kurniawan, ST.,MT.,Ph.D. (2014) METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=73542
spellingShingle ETD
, ARIEF WIRAGUNA
, Agus Kurniawan, ST.,MT.,Ph.D.
METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title_full METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title_fullStr METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title_full_unstemmed METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title_short METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA KARYA (Persero).
title_sort metode analisis perbandingan tulangan stek dan tulangan menerus kolom pada proyek pasar legi parakan temanggung pt hutama karya persero
topic ETD
work_keys_str_mv AT ariefwiraguna metodeanalisisperbandingantulanganstekdantulanganmeneruskolompadaproyekpasarlegiparakantemanggungpthutamakaryapersero
AT aguskurniawanstmtphd metodeanalisisperbandingantulanganstekdantulanganmeneruskolompadaproyekpasarlegiparakantemanggungpthutamakaryapersero