PENGEMBANGAN MODEL PENGELOLAAN SISTEM PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO YANG BERKELANJUTAN Studi Kasus PLTMH Kedungrong Desa Purwoharjo Kecamatan Samigaluh Kabupaten Kulon Progo Provinsi DI Yogyakarta
Yogyakarta Province until 2014 has built a total of 10 (ten) micro hydropower plants (MHP). However, from these ten MHPs, there is only 1 (one) which is still in operation, namely Kedungrong Micro Hydropower Plant. This Kedungrong Micro Hydropower Plant was selected as the research area due to its s...
Main Authors: | , ASPITA DYAH F, , Muhammad Sulaiman, S.T., M.T., D.Eng. |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: |
Similar Items
-
Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Di Aliran Sungai Desa Kejawar Banyumas
by: Unggah Rizki Harto Jawadz, et al.
Published: (2019-02-01) -
Studi Analisis Pengaruh Model Sudu Turbin Terhadap Putaran Pada Pembangkit Listrik Tenaga Mikro Hidro ( PLTMH )
by: donny christiawan, et al.
Published: (2017-08-01) -
Pengaruh stratigrafi lereng dan sifat mekanika tanah pada gerakan tanah di Dusun Kedungrong, Desa Purwoharjo, Kecamatan Samigaluh, Kabupaten Kulon Progo, Propinsi daerah Istimewa Yogyakarta
by: , PERMANAJATI, Indra, et al.
Published: (2004) -
DESAIN TURBIN ULIR DENGAN MATERIAL BAMBU
UNTUK PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
DENGAN MEMANFAATKAN TENAGA AIR
SALURAN IRIGASI
by: , SUKIJO, Drs, et al.
Published: (2011) -
Strategi Pengembangan Pembangkit Listrik Tenaga Air Mini/Mikro Hidro di Indonesia
by: Lena Tria Melati, et al.
Published: (2022-06-01)