GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN

Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follo...

Full description

Bibliographic Details
Main Authors: Anis, Mohamad, Idrus, Arifudin, Amijaya, Hendra, Subagyo, .
Format: Article
Language:English
Published: DEPARTEMEN TEKNIK GEOLOGI FT UGM 2016
Subjects:
Online Access:https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf
_version_ 1826049718841507840
author Anis, Mohamad
Idrus, Arifudin
Amijaya, Hendra
Subagyo, .
author_facet Anis, Mohamad
Idrus, Arifudin
Amijaya, Hendra
Subagyo, .
author_sort Anis, Mohamad
collection UGM
description Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follow some specific principles and factors in achieving sustainable development. These factors include geological conditions, land use, mining technology, environmental sustainability policies and government regulations, socio-economic factors, as well as sustainability optimization for post-mining land use. Resources of the remains of the coal which is defined as the last remaining condition of the resources and reserves of coal when the coal companies have already completed the life of the mine or the expiration of the licensing contract (in accordance with government permission). This research uses approch of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP) and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining) company named Adaro Indonesia (PT Adaro). The result shows that geologicaly the existing formation is dominated by Coal Bearing Formation (Warukin Formation) which allows the presence of remains coal resource potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of land use in all mining sites and also in some disposal places in conservation areas and protected forests.
first_indexed 2024-03-13T23:51:01Z
format Article
id oai:generic.eprints.org:273517
institution Universiti Gadjah Mada
language English
last_indexed 2024-03-13T23:51:01Z
publishDate 2016
publisher DEPARTEMEN TEKNIK GEOLOGI FT UGM
record_format dspace
spelling oai:generic.eprints.org:2735172017-07-04T07:57:11Z https://repository.ugm.ac.id/273517/ GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN Anis, Mohamad Idrus, Arifudin Amijaya, Hendra Subagyo, . Geology Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follow some specific principles and factors in achieving sustainable development. These factors include geological conditions, land use, mining technology, environmental sustainability policies and government regulations, socio-economic factors, as well as sustainability optimization for post-mining land use. Resources of the remains of the coal which is defined as the last remaining condition of the resources and reserves of coal when the coal companies have already completed the life of the mine or the expiration of the licensing contract (in accordance with government permission). This research uses approch of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP) and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining) company named Adaro Indonesia (PT Adaro). The result shows that geologicaly the existing formation is dominated by Coal Bearing Formation (Warukin Formation) which allows the presence of remains coal resource potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of land use in all mining sites and also in some disposal places in conservation areas and protected forests. DEPARTEMEN TEKNIK GEOLOGI FT UGM 2016-08-19 Article PeerReviewed application/pdf en https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf Anis, Mohamad and Idrus, Arifudin and Amijaya, Hendra and Subagyo, . (2016) GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN. PROCEEDING, SEMINAR NASIONAL KEBUMIAN KE-9 PERAN PENELITIAN ILMU KEBUMIAN DALAM PEMBERDAYAAN MASYARAKAT 6 - 7 OKTOBER 2016; GRHA SABHA PRAMANA. ISSN 2477 - 0248
spellingShingle Geology
Anis, Mohamad
Idrus, Arifudin
Amijaya, Hendra
Subagyo, .
GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title_full GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title_fullStr GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title_full_unstemmed GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title_short GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
title_sort gis based optimization method for utilizing coal remaining resources and post mining land use planning a case study of pt adaro coal mine in south kalimantan
topic Geology
url https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf
work_keys_str_mv AT anismohamad gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan
AT idrusarifudin gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan
AT amijayahendra gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan
AT subagyo gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan