GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN
Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follo...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
DEPARTEMEN TEKNIK GEOLOGI FT UGM
2016
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf |
_version_ | 1826049718841507840 |
---|---|
author | Anis, Mohamad Idrus, Arifudin Amijaya, Hendra Subagyo, . |
author_facet | Anis, Mohamad Idrus, Arifudin Amijaya, Hendra Subagyo, . |
author_sort | Anis, Mohamad |
collection | UGM |
description | Coal mining activities may cause a series of environmental and socio-economic issues in communities
around the mining area. Mining can become an obstacle to environmental sustainability and a major
hidden danger to the security of the local ecology. Therefore, the coal mining industry should follow
some specific principles and factors in achieving sustainable development. These factors include
geological conditions, land use, mining technology, environmental sustainability policies and
government regulations, socio-economic factors, as well as sustainability optimization for post-mining
land use. Resources of the remains of the coal which is defined as the last remaining condition of the
resources and reserves of coal when the coal companies have already completed the life of the mine or
the expiration of the licensing contract (in accordance with government permission). This research
uses approch of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP)
and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining
area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining) company named
Adaro Indonesia (PT Adaro). The result shows that geologicaly the existing formation is dominated by
Coal Bearing Formation (Warukin Formation) which allows the presence of remains coal resource
potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of land
use in all mining sites and also in some disposal places in conservation areas and protected forests. |
first_indexed | 2024-03-13T23:51:01Z |
format | Article |
id | oai:generic.eprints.org:273517 |
institution | Universiti Gadjah Mada |
language | English |
last_indexed | 2024-03-13T23:51:01Z |
publishDate | 2016 |
publisher | DEPARTEMEN TEKNIK GEOLOGI FT UGM |
record_format | dspace |
spelling | oai:generic.eprints.org:2735172017-07-04T07:57:11Z https://repository.ugm.ac.id/273517/ GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN Anis, Mohamad Idrus, Arifudin Amijaya, Hendra Subagyo, . Geology Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follow some specific principles and factors in achieving sustainable development. These factors include geological conditions, land use, mining technology, environmental sustainability policies and government regulations, socio-economic factors, as well as sustainability optimization for post-mining land use. Resources of the remains of the coal which is defined as the last remaining condition of the resources and reserves of coal when the coal companies have already completed the life of the mine or the expiration of the licensing contract (in accordance with government permission). This research uses approch of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP) and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining) company named Adaro Indonesia (PT Adaro). The result shows that geologicaly the existing formation is dominated by Coal Bearing Formation (Warukin Formation) which allows the presence of remains coal resource potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of land use in all mining sites and also in some disposal places in conservation areas and protected forests. DEPARTEMEN TEKNIK GEOLOGI FT UGM 2016-08-19 Article PeerReviewed application/pdf en https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf Anis, Mohamad and Idrus, Arifudin and Amijaya, Hendra and Subagyo, . (2016) GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN. PROCEEDING, SEMINAR NASIONAL KEBUMIAN KE-9 PERAN PENELITIAN ILMU KEBUMIAN DALAM PEMBERDAYAAN MASYARAKAT 6 - 7 OKTOBER 2016; GRHA SABHA PRAMANA. ISSN 2477 - 0248 |
spellingShingle | Geology Anis, Mohamad Idrus, Arifudin Amijaya, Hendra Subagyo, . GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT ADARO COAL MINE IN SOUTH KALIMANTAN |
title | GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING
RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT
ADARO COAL MINE IN SOUTH KALIMANTAN |
title_full | GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING
RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT
ADARO COAL MINE IN SOUTH KALIMANTAN |
title_fullStr | GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING
RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT
ADARO COAL MINE IN SOUTH KALIMANTAN |
title_full_unstemmed | GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING
RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT
ADARO COAL MINE IN SOUTH KALIMANTAN |
title_short | GIS-BASED OPTIMIZATION METHOD FOR UTILIZING COAL REMAINING
RESOURCES AND POST-MINING LAND USE PLANNING: A CASE STUDY OF PT
ADARO COAL MINE IN SOUTH KALIMANTAN |
title_sort | gis based optimization method for utilizing coal remaining resources and post mining land use planning a case study of pt adaro coal mine in south kalimantan |
topic | Geology |
url | https://repository.ugm.ac.id/273517/1/32%20MOA-01%20Gis-Based%20Optimization%20Method%20For%20Remaining%20Coal%20Resource%20And%20Utilization%20Of%20Post-Mining%20Land%20Use%20Planning%20A%20Case%20Study%20Of%20Pt%20Adaro%20Coal%20Mine%20In%20South%20Kalimantan-Anis%2C%20M.%2C%20et%20al.%20.pdf |
work_keys_str_mv | AT anismohamad gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan AT idrusarifudin gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan AT amijayahendra gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan AT subagyo gisbasedoptimizationmethodforutilizingcoalremainingresourcesandpostmininglanduseplanningacasestudyofptadarocoalmineinsouthkalimantan |