Development and Validation of Coupled PARCS/RELAP5 Model for Forsmark NPP at Uprated Power
This paper gives an account of the development and validation of an up-to-date coupled neutronic/thermal-hydraulic model for the Swedish Forsmark boiling water reactor. The model will be used for analyses of the consequences of the planned power uprate from 2928 MWth to 3253 MWth. At first, the dev...
Main Authors: | Agung, Alexander, Bánáti, József |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/275200/1/NUTHOS10_paper%20lengkap.pdf |
Similar Items
-
Validation of PARCS/RELAP5 Coupled Model Against Load Rejection Transient at the Ringhals-3 NPP
by: Agung, Alexander, et al.
Published: (2013) -
Thermal-hydraulic analysis of loss-of-cooling accident in spent fuel pool of Bushehr NPP using the RELAP5 and MELCOR
by: S. Gol Narges, et al.
Published: (2020-11-01) -
Achievable power uprates in pressurized water reactors using uranium nitride fuel
by: Giudicelli, Guillaume
Published: (2017) -
Maximizing nuclear power plant performance via mega-uprates and subsequent license renewal
by: DeWitte, Jacob D. (Jacob Dominic)
Published: (2015) -
Controls on fracture openness and reactivation in Forsmark, Sweden
by: D. Doolaeghe, et al.
Published: (2023-04-01)