Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable w...
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Departemen Teknik Mesin dan Industri UGM
2019
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf |
_version_ | 1797036949245001728 |
---|---|
author | Hartik, Sumara Murnawan, Hery |
author_facet | Hartik, Sumara Murnawan, Hery |
author_sort | Hartik, Sumara |
collection | UGM |
description | UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable which results in an inefficient production process. At present the UD Logam Abadi decided to expand the industry to become Plant 1 only, due to consideration of the increasing demand for products, based on the results of the data processing and analysis that has been done, it is found that the current production facility is in the form of an expansion with a fixed capacity of 348 kg per day requiring an area of 146m2. from the first condition there are 2 Plants, namely Plant 1 covering an area of 110 m2 and Plant 2 covering an area of 36 m2 from the first layout the income obtained is Rp. 6,492,197,309 per year, while income from Relayout is Rp. 6,503,206,371 / year which can save labor, material handling costs and building rental fees of Rp. 11,009,062 per year. Plans to increase production capacity from 348 kg per day to 705 kg per day by making Relayout required an area of 180 m2 which provides a net income of Rp. 12,955,484,563 per year |
first_indexed | 2024-03-13T23:54:55Z |
format | Conference or Workshop Item |
id | oai:generic.eprints.org:275365 |
institution | Universiti Gadjah Mada |
language | English |
last_indexed | 2024-03-13T23:54:55Z |
publishDate | 2019 |
publisher | Departemen Teknik Mesin dan Industri UGM |
record_format | dspace |
spelling | oai:generic.eprints.org:2753652020-10-12T06:29:37Z https://repository.ugm.ac.id/275365/ Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam Hartik, Sumara Murnawan, Hery Industrial Engineering UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable which results in an inefficient production process. At present the UD Logam Abadi decided to expand the industry to become Plant 1 only, due to consideration of the increasing demand for products, based on the results of the data processing and analysis that has been done, it is found that the current production facility is in the form of an expansion with a fixed capacity of 348 kg per day requiring an area of 146m2. from the first condition there are 2 Plants, namely Plant 1 covering an area of 110 m2 and Plant 2 covering an area of 36 m2 from the first layout the income obtained is Rp. 6,492,197,309 per year, while income from Relayout is Rp. 6,503,206,371 / year which can save labor, material handling costs and building rental fees of Rp. 11,009,062 per year. Plans to increase production capacity from 348 kg per day to 705 kg per day by making Relayout required an area of 180 m2 which provides a net income of Rp. 12,955,484,563 per year Departemen Teknik Mesin dan Industri UGM 2019 Conference or Workshop Item PeerReviewed application/pdf en https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf Hartik, Sumara and Murnawan, Hery (2019) Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam. In: Seminar Nasional Teknik Industri 2019. http://senti.ft.ugm.ac.id/ |
spellingShingle | Industrial Engineering Hartik, Sumara Murnawan, Hery Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title | Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title_full | Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title_fullStr | Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title_full_unstemmed | Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title_short | Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam |
title_sort | perancangan tata letak fasilitas produksi relayout guna perluasan area produksi pengecoran logam |
topic | Industrial Engineering |
url | https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf |
work_keys_str_mv | AT hartiksumara perancangantataletakfasilitasproduksirelayoutgunaperluasanareaproduksipengecoranlogam AT murnawanhery perancangantataletakfasilitasproduksirelayoutgunaperluasanareaproduksipengecoranlogam |