Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam

UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable w...

Full description

Bibliographic Details
Main Authors: Hartik, Sumara, Murnawan, Hery
Format: Conference or Workshop Item
Language:English
Published: Departemen Teknik Mesin dan Industri UGM 2019
Subjects:
Online Access:https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf
_version_ 1797036949245001728
author Hartik, Sumara
Murnawan, Hery
author_facet Hartik, Sumara
Murnawan, Hery
author_sort Hartik, Sumara
collection UGM
description UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable which results in an inefficient production process. At present the UD Logam Abadi decided to expand the industry to become Plant 1 only, due to consideration of the increasing demand for products, based on the results of the data processing and analysis that has been done, it is found that the current production facility is in the form of an expansion with a fixed capacity of 348 kg per day requiring an area of 146m2. from the first condition there are 2 Plants, namely Plant 1 covering an area of 110 m2 and Plant 2 covering an area of 36 m2 from the first layout the income obtained is Rp. 6,492,197,309 per year, while income from Relayout is Rp. 6,503,206,371 / year which can save labor, material handling costs and building rental fees of Rp. 11,009,062 per year. Plans to increase production capacity from 348 kg per day to 705 kg per day by making Relayout required an area of 180 m2 which provides a net income of Rp. 12,955,484,563 per year
first_indexed 2024-03-13T23:54:55Z
format Conference or Workshop Item
id oai:generic.eprints.org:275365
institution Universiti Gadjah Mada
language English
last_indexed 2024-03-13T23:54:55Z
publishDate 2019
publisher Departemen Teknik Mesin dan Industri UGM
record_format dspace
spelling oai:generic.eprints.org:2753652020-10-12T06:29:37Z https://repository.ugm.ac.id/275365/ Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam Hartik, Sumara Murnawan, Hery Industrial Engineering UD. Logam Abadi is a metal casting company, currently the industry is experiencing problems, that is Plant 2, which has a status of rent and different locations, is about 4 kilometers from Plant 1 of the UD Logam Abadi. Layout of production facilities in the UD. Logam Abadi is currently unsuitable which results in an inefficient production process. At present the UD Logam Abadi decided to expand the industry to become Plant 1 only, due to consideration of the increasing demand for products, based on the results of the data processing and analysis that has been done, it is found that the current production facility is in the form of an expansion with a fixed capacity of 348 kg per day requiring an area of 146m2. from the first condition there are 2 Plants, namely Plant 1 covering an area of 110 m2 and Plant 2 covering an area of 36 m2 from the first layout the income obtained is Rp. 6,492,197,309 per year, while income from Relayout is Rp. 6,503,206,371 / year which can save labor, material handling costs and building rental fees of Rp. 11,009,062 per year. Plans to increase production capacity from 348 kg per day to 705 kg per day by making Relayout required an area of 180 m2 which provides a net income of Rp. 12,955,484,563 per year Departemen Teknik Mesin dan Industri UGM 2019 Conference or Workshop Item PeerReviewed application/pdf en https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf Hartik, Sumara and Murnawan, Hery (2019) Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam. In: Seminar Nasional Teknik Industri 2019. http://senti.ft.ugm.ac.id/
spellingShingle Industrial Engineering
Hartik, Sumara
Murnawan, Hery
Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title_full Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title_fullStr Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title_full_unstemmed Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title_short Perancangan Tata Letak Fasilitas Produksi (Relayout) Guna Perluasan Area Produksi Pengecoran Logam
title_sort perancangan tata letak fasilitas produksi relayout guna perluasan area produksi pengecoran logam
topic Industrial Engineering
url https://repository.ugm.ac.id/275365/1/Perancangan%20Tata%20Letak%20Fasilitas%20Produksi%20%28Relayout%29%20Guna%20Perluasan%20Area%20Produksi%20Pengecoran%20Logam.pdf
work_keys_str_mv AT hartiksumara perancangantataletakfasilitasproduksirelayoutgunaperluasanareaproduksipengecoranlogam
AT murnawanhery perancangantataletakfasilitasproduksirelayoutgunaperluasanareaproduksipengecoranlogam