Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur

Previous studies on nonitoring Borobudur’s horizontal deformation have shown that the traverse precisions have not met the requirement standar for deformation analysis. This can be caused by inaccurate measurements of the angles or distance of closed traverse and the minimum redundancy number in adj...

Full description

Bibliographic Details
Main Authors: Lestari, Dwi, Widjajanti, Nurrohmat
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:https://repository.ugm.ac.id/276032/1/_SNP21.pdf
_version_ 1797037044817461248
author Lestari, Dwi
Widjajanti, Nurrohmat
author_facet Lestari, Dwi
Widjajanti, Nurrohmat
author_sort Lestari, Dwi
collection UGM
description Previous studies on nonitoring Borobudur’s horizontal deformation have shown that the traverse precisions have not met the requirement standar for deformation analysis. This can be caused by inaccurate measurements of the angles or distance of closed traverse and the minimum redundancy number in adjustment computation. This study aims to analyze the strength of figure of horizontal deformation monitoring network from previous study and evaluate new design of monitoring netwoks which are measured using Total Station. The research is done firstly by evaluating the strength of figure of horizontal deformation network as observed in 2011. Based on this evaluation, new observations of three different network design using Nikon DTM 352 Total Station has been done. Data from the measurement are then processed using the least square adjustment method using minimal constraints. Global test conducted to evaluate the result of the adjustment computation. Further evaluation of the strength of figure is made based on the correlation value between the estimated parameters and the point positions precision is evaluated using their standard deviation values. The results showed that the design of a closed traverse in this study (design-A) has a weak geometry, which isindicated by the correlation values between the parameter are close to -1 or +1. The addition of tie points and the number of redundancies increase the strength of the network significantly, while the measurement precisions contribute significantly to the precision of the estimated parameters.
first_indexed 2024-03-13T23:56:23Z
format Conference or Workshop Item
id oai:generic.eprints.org:276032
institution Universiti Gadjah Mada
language English
last_indexed 2024-03-13T23:56:23Z
publishDate 2013
record_format dspace
spelling oai:generic.eprints.org:2760322020-04-23T04:24:47Z https://repository.ugm.ac.id/276032/ Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur Lestari, Dwi Widjajanti, Nurrohmat Geomatic Engineering Geodesy Navigation and Position Fixing Engineering Previous studies on nonitoring Borobudur’s horizontal deformation have shown that the traverse precisions have not met the requirement standar for deformation analysis. This can be caused by inaccurate measurements of the angles or distance of closed traverse and the minimum redundancy number in adjustment computation. This study aims to analyze the strength of figure of horizontal deformation monitoring network from previous study and evaluate new design of monitoring netwoks which are measured using Total Station. The research is done firstly by evaluating the strength of figure of horizontal deformation network as observed in 2011. Based on this evaluation, new observations of three different network design using Nikon DTM 352 Total Station has been done. Data from the measurement are then processed using the least square adjustment method using minimal constraints. Global test conducted to evaluate the result of the adjustment computation. Further evaluation of the strength of figure is made based on the correlation value between the estimated parameters and the point positions precision is evaluated using their standard deviation values. The results showed that the design of a closed traverse in this study (design-A) has a weak geometry, which isindicated by the correlation values between the parameter are close to -1 or +1. The addition of tie points and the number of redundancies increase the strength of the network significantly, while the measurement precisions contribute significantly to the precision of the estimated parameters. 2013-02-13 Conference or Workshop Item PeerReviewed application/pdf en https://repository.ugm.ac.id/276032/1/_SNP21.pdf Lestari, Dwi and Widjajanti, Nurrohmat (2013) Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur. In: Annual Engineering Seminar, 2013, Februari 2013, Yogyakarta.
spellingShingle Geomatic Engineering
Geodesy
Navigation and Position Fixing
Engineering
Lestari, Dwi
Widjajanti, Nurrohmat
Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title_full Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title_fullStr Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title_full_unstemmed Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title_short Evaluasi Kekuatan Geometri Jaring Pemantau Deformasi Horizontal Candi Borobudur
title_sort evaluasi kekuatan geometri jaring pemantau deformasi horizontal candi borobudur
topic Geomatic Engineering
Geodesy
Navigation and Position Fixing
Engineering
url https://repository.ugm.ac.id/276032/1/_SNP21.pdf
work_keys_str_mv AT lestaridwi evaluasikekuatangeometrijaringpemantaudeformasihorizontalcandiborobudur
AT widjajantinurrohmat evaluasikekuatangeometrijaringpemantaudeformasihorizontalcandiborobudur