The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang

Economically, the aim of industrial activities held by a company is to maximize profits. The profits will be maximized if the outcomes are assessed minimally. One component of outcomes is production costs. The amount of production costs is directly proportional to the time of production. The longer...

Full description

Bibliographic Details
Main Authors: Hidayat, M. S., Dianastari R, R., Ichsan, A. N., Zaki, S.
Format: Other
Published: AIP Conference Proceedings 2022
Subjects:
_version_ 1797037849417089024
author Hidayat, M. S.
Dianastari R, R.
Ichsan, A. N.
Zaki, S.
author_facet Hidayat, M. S.
Dianastari R, R.
Ichsan, A. N.
Zaki, S.
author_sort Hidayat, M. S.
collection UGM
description Economically, the aim of industrial activities held by a company is to maximize profits. The profits will be maximized if the outcomes are assessed minimally. One component of outcomes is production costs. The amount of production costs is directly proportional to the time of production. The longer production requires relatively greater costs. In addition, the timeliness of production will also affect the company's performance rating for the customer. In this case, production time becomes an important part of industrial activities. One method that can be used to analyze production time is the Critical Path Method (CPM). In this paper CPM is used with the Activity on Arrow (AOA) approach. This method was applied to analyze the production time of Teh Botol Sosro at PT. Sinar Sosro Ungaran Semarang. The results of this paper are optimal production time, delay analysis and production scheduling based on the earliest start and the latest start
first_indexed 2024-03-14T00:10:15Z
format Other
id oai:generic.eprints.org:284432
institution Universiti Gadjah Mada
last_indexed 2024-03-14T00:10:15Z
publishDate 2022
publisher AIP Conference Proceedings
record_format dspace
spelling oai:generic.eprints.org:2844322023-12-20T06:44:19Z https://repository.ugm.ac.id/284432/ The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang Hidayat, M. S. Dianastari R, R. Ichsan, A. N. Zaki, S. Numerical Analysis Economically, the aim of industrial activities held by a company is to maximize profits. The profits will be maximized if the outcomes are assessed minimally. One component of outcomes is production costs. The amount of production costs is directly proportional to the time of production. The longer production requires relatively greater costs. In addition, the timeliness of production will also affect the company's performance rating for the customer. In this case, production time becomes an important part of industrial activities. One method that can be used to analyze production time is the Critical Path Method (CPM). In this paper CPM is used with the Activity on Arrow (AOA) approach. This method was applied to analyze the production time of Teh Botol Sosro at PT. Sinar Sosro Ungaran Semarang. The results of this paper are optimal production time, delay analysis and production scheduling based on the earliest start and the latest start AIP Conference Proceedings 2022 Other NonPeerReviewed Hidayat, M. S. and Dianastari R, R. and Ichsan, A. N. and Zaki, S. (2022) The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang. AIP Conference Proceedings. https://pubs.aip.org/aip/acp/article-abstract/2471/1/020003/2825680/The-application-of-critical-path-method-CPM-on-the?redirectedFrom=fulltext 10.1063/5.0082745
spellingShingle Numerical Analysis
Hidayat, M. S.
Dianastari R, R.
Ichsan, A. N.
Zaki, S.
The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title_full The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title_fullStr The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title_full_unstemmed The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title_short The application of critical path method (CPM) on the production time analysis of Teh Botol Sosro at Pt. Sinar Sosro Ungaran, Semarang
title_sort application of critical path method cpm on the production time analysis of teh botol sosro at pt sinar sosro ungaran semarang
topic Numerical Analysis
work_keys_str_mv AT hidayatms theapplicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT dianastarirr theapplicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT ichsanan theapplicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT zakis theapplicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT hidayatms applicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT dianastarirr applicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT ichsanan applicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang
AT zakis applicationofcriticalpathmethodcpmontheproductiontimeanalysisoftehbotolsosroatptsinarsosroungaransemarang