Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
Commentators advocate that most practitioners focus only on conversion but very seldom they consider the reliability and credibility of data inputs of Life Cycle Cost (LCC). The research identified two developed LCC conversion softwares in the Malaysian construction industry: LICCOMS and LCCsoft how...
Main Authors: | Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin |
---|---|
Format: | Proceeding Paper |
Language: | English English English |
Published: |
2011
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/37728/1/International_JV_28_September_2011.pdf http://irep.iium.edu.my/37728/4/CertificateJVConf.IMG.pdf http://irep.iium.edu.my/37728/7/JV_LETTER_OF_INVITATION-03.pdf |
Similar Items
-
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014) -
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011) -
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013) -
Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2012) -
A literature review on the state and practice of life cycle cost (LCC) in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)